网站大量收购独家精品文档,联系QQ:2885784924

李打(Lida).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
李打(Lida)

李打(Lida) Activity room: 1, each lightning protection grounding detection points have all been tested, all 0.35, comply with the standard requirements. 2, the main structure of the column outside the main reinforcement two lead line (lightning protection, grounding), the solder joints meet the specifications, the previous individual solder joints have not reached the requirements, has been re welded. 3, through the trunk cable, steel pipe laying, meet the specifications. Liaison form for supervision work 02 Institute of ath1etic school: Subject: on the 2 floor C to FX1 to 5 floor reinforcement 8 for 10 matters. Content: On the two floor of 8 on the 10 reinforced issue has repeatedly verbally inform you by Specification for construction quality acceptance of concrete structure engineering GB50204 - 2002 5.1.1, when the steel varieties or specifications required for level changes should go through the design change document, not for the design change document, receiving the contact list immediately apply for design change file. If there is no design change document, it must be constructed according to the plan. 2010.9.23 Institute affiliated school of competitive sports activity room Monthly report of supervision two 2010.8.26 ~ 2010.9.26 I. General Situation of the project This month construction range B ~ Fx2 B Foundation Beam excavation, formwork support, steel banding, pouring concrete, A ~ Fx1 ~ 6 backfill, pouring and tamping indoor construction floor. A ~ Cx1 to 5, a layer of column steel banding, formwork support, two layer beam plate formwork. Installation of beam and slab reinforcement and installation of wire buried pipe. Two, engineering image progress Foundation excavation, formwork supporting, lashing, pouring and tamping of concrete, and backfilling of soil. A to Cx1 to 5, a layer of columns, two layers of beam, plate, formwork, the end of the beam reinforcement, floor reinforcement binding, 50% wire pre buried, installed. Three. Progress of the project

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档