- 1、本文档共17页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
构造人工湿地(Constructed wetland)
构造人工湿地(Constructed wetland)
Constructed wetland
Through the design and construction of constructed wetlands, wetland sewage treatment with dike and the impermeable layer, groove shaped or pond bed type. It is an independent sewage treatment system consisting of several wetlands. Constructed wetland is a simulated natural wetland, composed of water, saturated matrix, aquatic plants, wild animals and microorganisms.
The constructed wetland sewage treatment system belongs to biological treatment facilities, and does not depend on the strengthening of power, but is effective in bringing into full play the purification function of natural organisms. Purification mechanism of constructed wetland sewage from flowing through the plant growth medium, biochemical reactions resulting in filtration, sedimentation, adsorption and other physical, physical and chemical effects and pollutants and matrix forms; microorganism plays an important role in the process, can maintain suitable microbial environmental conditions will determine the effectiveness of the treatment. The purification process includes three purification mechanisms: anaerobic, facultative and aerobic.
From the aspect of hydraulic division constructed wetland is divided into surface flow and subsurface flow in two forms, because the subsurface constructed wetland has the advantages of high processing efficiency, small occupation area, reliable effect, impact resistance and not easy to breed mosquitoes and other characteristics, so the common constructed wetland to latent type are manifold.
In order to ensure the water quality of subsurface flow wetland in winter, subsurface flow constructed wetland HRT should be maintained at 4~7d, while subsurface constructed wetland should be 0.8~1m in depth. Therefore, the technology covers a large area, and its ratio (daily processing capacity: total floor space) is generally around 1:10, in the South can be appropriately reduced, the North should be appropriately improved.
The
您可能关注的文档
- 技能提升(Skills upgrading).doc
- 批量复制网页图片(The bulk copy web images).doc
- 把职业素养渗透到数控实训课(The occupation toinfiltrate NC training course).doc
- 投标文件范本(Model bid documents).doc
- 抗震措施和抗震构造措施(Seismic measures and structural measures).doc
- 抗震设计需要掌握的原则(To master the principle of seismic design).doc
- 抗震计算方法5)(The seismic calculation method 5)).doc
- 折减选择、振型个数(Reduction selection, mode number).doc
- 折弯系数、k因子(Bending coefficient, K factor).doc
- 抑郁症诊断标准(The diagnostic criteria of depression).doc
- 注册验船师高频真题题库2025.docx
- 注册验船师高频题库带解析2025.docx
- 注册验船师考试必备资料2025.docx
- 注册验船师精选题库带分析2025.docx
- 注册验船师考前冲刺必刷题附答案2025.docx
- 新高考生物二轮复习讲练测第10讲 人体的稳态与免疫调节(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第13讲 生物技术与工程(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第9讲 神经调节与体液调节(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第7讲 遗传的基本规律与伴性遗传(检测)(原卷版) .docx
- 新高考生物二轮复习讲练测第13讲 生物技术与工程(检测)(原卷版).docx
文档评论(0)