- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
河南预算员需知(The Henan budget officer needs to know)
河南预算员需知(The Henan budget officer needs to know)
08 years of construction and decoration engineering construction cost management: basic knowledge, construction project valuation and foundation (volumes), bill of quantities bidding case.
Key points of examination of cost personnel in Henan Province
2008-7-17 [large, medium and small] [Print]
Part 1 cost related knowledge
1, the Ministry of construction (206) document cost items composition
The concept of cost structure, sub item name, especially the content of the fee
The construction cost list only requires that the sub item under the main item of the first level does not need
2, the difference and relation between budget estimate and budget
3, Henan [2005] (222) document evaluation methods and contract price determination
Fourth (omitted)
Sixth (omitted)
Seventh (omitted)
Eighth, second paragraph
4, Ministry of finance, Ministry of construction, finance construction (2004) No. 369 project price settlement
The range of eighth, tenth, twelfth, advances 10-30%
Fourteenth (two) (three)
Document 5[2005]101 labor cost adjustment
Start date of execution
6 notice of the administrative measures for the pricing of safety and civilized construction measures in Henan Province
Henan construction standard [2006] No. 82
Document itself
Second, third, fourth, if the calculation questions are used, the test conditions will be given
Attachments are not required
7 code for calculation of floor space
Article 3.01 (article)
Clause 3.0.18 (article)
Clause 3.0.22 (article)
The second part of a comprehensive price
The last three years of examination questions in the corresponding content all practice proficiency, the examination content does not go beyond these content.
The third part is Bill of quantities pricing
1 the mandatory provisions in the valuation standards may be considered in objective terms
2, we should focus on the implementation rules of Henan Province, with emphasis on eighteenth, nineteenth, twentieth, 27, 34 and 36
3 pay
您可能关注的文档
- 曹全碑(Stele of Cao).doc
- 最全初二地理复习(The first two days of geography review).doc
- 最全的世界和中国之最,你知道多少(Most of the world and China's most, you know how much).doc
- 最全面的空压机安装维护手册(The most comprehensive manual for air compressor installation and maintenance).doc
- 暖气温度不足因素排查.doc
- 最后一片叶子(The last leaf).doc
- 曼陀罗(Datura).doc
- 最快(The fastest).doc
- 最成功的项目管理经验总结(The most successful project management experience summary).doc
- 最新东莞厂房出售信息(The latest Dongguan plant sale information).doc
- 法兰克g代码(Frank G code).doc
- 治病和送瘟(Treating diseases and delivering pathogenic diseases).doc
- 法律社会学教学探析(李涛) - 云南师范大学(Analysis of legal sociology teaching (Li Tao) - Yunnan Normal University).doc
- 法兰结构密封面形式(Sealing surface form of flange structure).doc
- 法国公共卫生法(French Public Health Act).doc
- 波形护栏施工方案(Construction plan of corrugated guardrail).doc
- 波司登发展历程(最全的0(The development course of Bosideng (most of the 0).doc
- 波峰焊焊接桥连现象的分析和解决(Analysis and solution of bridge phenomenon in wave soldering).doc
- 泥浆工艺(Slurry technology).doc
- 泥浆护壁(Mud protection wall).doc
文档评论(0)