网站大量收购独家精品文档,联系QQ:2885784924

混凝土搅拌站2011年工作总结(Summary of work of concrete mixing station in 2011).doc

混凝土搅拌站2011年工作总结(Summary of work of concrete mixing station in 2011).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
混凝土搅拌站2011年工作总结(Summary of work of concrete mixing station in 2011)

混凝土搅拌站2011年工作总结(Summary of work of concrete mixing station in 2011) First, check the contents and results 1.1 check the contents 1.1.1 material: the scene randomly (do Fly Ash Fineness and burning vector) and concrete admixtures (CL-1, superplasticizer, compressive strength ratio), sealed samples were detected to retrieve. 1.1.2 concrete test block: 3 groups of different age of C30 more than the field test in the indoor maintenance standard production enterprises were selected; concrete mix with 3 extraction forming inspection days and 7 days, 28 days strength test. 1.1.3 mix: view the mix design conforms to the national standard, the amount of cement has reached the standard requirements, concrete mix proportion notice compliance record and actual production; mix verification of original records. 1.2 examination results (see table) Two, the main problems found 2.1 the use of raw material: a large number of enterprises and even the excessive use of three fly ash and fly ash is not qualified. The sampling a total of 26 units including the use of fly ash, two ash accounted for 23%, three ash use accounted for 53%, the use of substandard cement accounted for 23%, and the content is too large, one of the companies with C20 than in fly ash as high as 54%. The above does not conform to the technical specification for application of concrete and mortar (JGJ28-86) and fly ash concrete application technology standard (GBJ146-90), about C20 above the concrete should be used in class I and II fly ash, fly ash ratio should not exceed 35% of the amount of cement concrete with C20 and above C20 grade concrete. Fly ash and cement replacement rate should not exceed 20%. Grade fly ash is mainly used for non reinforced concrete, fly ash cement replacement rate should not exceed 40% specification requirements. A direct consequence of fly ash not according to the requirements of the one hand lead to concrete strength reduction and durability of the decline, especially structural safety

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档