现场测试(Field test).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
现场测试(Field test)

现场测试(Field test) Six 、 field test: 1. Please correct the test procedure of sand filling test. (1) direct the sand filling tube on the test pit, open the sand storage barrel switch, and let the sand flow into the test pit. Until the sand in the sand storage tank is no longer dirty, the switch is closed and the quality of the remaining sand is weighed. (2) the quality of the sand in the lower cone of the sand filling tank shall be calibrated according to the requirements. (3) representative samples were taken from all the excavated materials to determine the water content. (4) take out the sand in the test tube carefully for reuse in the next test. (5) choose the test site and clean it. (6) a hole, remove all loose material chisel. (7) calculation of sand filling density. Answer: the correct test order is: 2, 5,, 6, 1, 3, 7, 4 2, please correct the test procedure (using pressure ring and flow meter) for the asphalt mixture Marshall stability. (1) in the Marshall test head tee anti properly ball, and aligned head load measuring device. (2) start loading equipment so that the test pieces bear load. (3) keep the specimen in a constant temperature tank at the prescribed temperature until the specified time. (4) the flow meter is installed on the guide rod and the pressure head pressure on the light guide tube, the flow meter readings of zero, zero indicator adjustment pressure ring. (5) when the test load reaches the maximum moment, remove the flow meter, and read the pressure ring and flow meter dial indicator readings flow. (6) put the upper and lower head of Marshall tester into the sink or oven. After the same temperature, remove the sassafras and try to clean the inside. Take out the test piece and place it on the lower pressure head. Cover the head and install it on the loading equipment. Answer: the correct test procedure is: 3, 6,, 1, 4, 2, 5 3, please correct the subgrade modulus of resilience on the bearing plate test. The jack loading, preloading to 0.05Mpa, th

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档