系杆拱桥横梁内力计算方法(Calculation method of crossbeam internal force of Tied Arch Bridge).docVIP

系杆拱桥横梁内力计算方法(Calculation method of crossbeam internal force of Tied Arch Bridge).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
系杆拱桥横梁内力计算方法(Calculation method of crossbeam internal force of Tied Arch Bridge)

系杆拱桥横梁内力计算方法(Calculation method of crossbeam internal force of Tied Arch Bridge) The calculation method of tied arch bridge beams Date of submission: 1122: 2004-02-13. Abstract: tied arch bridge because of its structure characteristics, application of new materials and new technology, the application in our country is getting more and more. Deck beam is an important component of direct bearing and power transmission. According to the principle of deformation coordination is practical in beam calculation method. The first clear analysis the stress mechanism of the beam, is formed between the thrust beam and municipalities principle tied when belong to the weak fixed effect, then according to the relationship between a beam and the end of the beam at the junction of the establishment of the corresponding tie bar internal force and deformation coordination equation for solving the beam section. The last is to solve a problem of linear equations. The analysis shows that the beam internal force and torsional stiffness and tie line beam bending stiffness ratio has a certain relationship. For the maximum and minimum bending beam short of the most unfavorable live load layout, with the number of cases in this paper expounded, the calculation results verified that can meet the requirement of Engineering design. Through this method for engineering design provides a practical calculation method is simple and clear. Keywords: beam internal force calculation method of Tied Arch Bridge 1 Introduction Bowstring arch Johnson due to its external static internal super good, no bearing arch thrust, large spanning capacity, for bridge navigation clearance requirements of high plains, a poor foundation bridge, tied arch bridge has obvious advantages, and in many areas has been applied more and more the. The structure of main arch rib tied arch, and a hanging rod, in the transverse beam and upper brace put two pieces of arch as a whole, and then in the beam on the deck and bridge deck st

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档