- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
钢网架结构安装工艺标准(507-1996)(Standard for installation of steel grid structures (507-1996))
钢网架结构安装工艺标准(507-1996)(Standard for installation of steel grid structures (507-1996))
Range
The process standard is applicable to the installation of steel grid structure, high altitude bulk method, high altitude slip method or ground assembly, overall lifting (lifting) and so on.
Construction preparation
2.1 materials
2.1.1 steel grid installed steel and connecting materials, high-strength bolts, welding rod, welding wire, flux and so on, should comply with the design requirements, and should have factory certificate.
Hollow welded ball, ribbed welded ball and bolt ball for installation of 2.1.2 steel grid. Semi-finished products, small units, bars, and rubber bearings and other semi-finished products should comply with the design requirements and the corresponding national standards.
2.2 main machines and tools:
Electric welding machine, oxyacetylene cutting equipment, grinding wheel, cutting lathe, sawing rod rod cutting power head, steel tape, steel ruler, caliper, level, theodolite, ultrasonic flaw detector, magnetic particle detector, lifting equipment, lifting equipment, hammer, steel wire brush, hydraulic jack, chain other tools.
2.3 operating conditions:
Before installing the 2.3.1, check the axis and the elevation of the support frame of the network. The axis and elevation of the grid must comply with the design requirements and the relevant standards.
2.3.2 before installation should check the strength of concrete columns, column concrete strength must be compatible with the existing provisions of relevant standards and design requirements of countries, in order to install.
When the 2.3.3 uses the high altitude slip method, the sliding track pulley should be checked, and the slip horizontal slope should meet the requirements of the construction design.
When the 2.3.4 is installed with bars and blocks, the sliding table shall be checked and the test run shall be carried out when the worktable slides.
2.3.5 by lifting the overall or partial lifting time, dea
您可能关注的文档
- 试验室(Test room).doc
- 试验设计与产品研发过程- -(Experimental design and product development process -).doc
- 试验员复习(The pilot reviewed).doc
- 诗句唯美(Verse Aestheticism).doc
- 诗意(Poetic flavour).doc
- 诗歌朗诵稿(A poem manuscript).doc
- 诚信是金和感恩的心(Honesty is the heart of gold and gratitude).doc
- 诛仙前传炼器技巧(Zhu Xian refining techniques).doc
- 话说甘薯(Sweet potato).doc
- 话题作文逼出成功(Topic composition force success).doc
- 钱学森与《工程控制论》(Tsien Hsueshen and engineering cybernetics).doc
- 钳工基础知识(二)(Basic knowledge of locksmith (two)).doc
- 钢结构监理课件(Steel structure supervision courseware).doc
- 钣金工程图及加工基础(Sheet metal engineering drawing and machining basis).doc
- 钳工试题 与答案(Locksmith examination questions and answers).doc
- 钱学森(Tsien Hsueshen).doc
- 钢铁中英词汇(Chinese and English words in iron and steel).doc
- 钳工高级工试题(Locksmith senior engineer).doc
- 钻井工程的一些常用专业术语(Some commonly used technical terms in drilling engineering).doc
- 钢结构考试简答(Use the test of steel structure).doc
文档评论(0)