- 1、本文档共14页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
新时达f参数说明(Step f parameter description)
新时达f参数说明(Step f parameter description)
Motherboard parameter description (with no parameter classification operator used)
Parameter, parameter, meaning, remark, factory value, unit read
0 acceleration slope adjustment start acceleration 550 mm/s2 0.55m/ S2
1 deceleration slope adjustment braking deceleration 550 mm/s2 0.55m/ S2
2 S curve T0 start initial S bending angle time 1300 0.01s 1.300s
3 S curve, T1 acceleration, S bending time 1100 0.01s 1.100s
4 S curve, T2 deceleration, initial S bending time 1100 0.01s 1.100s
5 S curve, T3 deceleration end, S bend angle time 1300 0.01s 1.300s
6 elevator rated speed elevator calibration value 1750 mm/s 1.75m/s
7 motor rated speed motor nameplate value 1450 rpm 1450rpm
8 encoder pulse number encoder after PG card frequency division each revolution pulse number 1024 PPR 1024ppr
9 lock ladder, base station, lock ladder, return base station 1
10 bias layer 0
11 preset total number of plies installed in hoistway 18
12 overhaul speed, maintenance speed of 250 mm/s 0.250m/s
13 back leveling speed, automatic leveling layer, the speed of 60 mm/s 0.060m/s
14 closing delay 1 response to the call, stop the ladder, open the door to maintain the time 30 0.1s 3.0s
15 closing delay 2 response to internal election stop when the door open hold time 30 0.1s 3.0s
The 16 gate delay from the signal given to the governor operation began to open the brake delay time of 2 0.1s 0.2S
17 removal operation started to remove brake delay from the governor operation signal delay time of 6 0.1s 0.6s
18 fire base station fire status returned base station 1
19 second fire station 1
20 delay base time 0: no delay, immediately back to the base station. 0 s 0s
21 leveling error, distance from lift, single deck operation and multi-layer operation, leveling error correction, 6, mm, 6mm
When the 22 is in parallel, the first base station is connected by a first base station in parallel (see F20, F196, F197) 1
23 parallel mode 1: parallel ladder (compatible with th
您可能关注的文档
- 壁纸叫板乳胶漆(Wallpaper challenge latex paint).doc
- 声律启蒙(Sound of Enlightenment).doc
- 战场女武神3 兵种熟练度(Battlefield skills of 3 armed women).doc
- 战后德国贸易(Postwar German trade).doc
- 截句(four-line poem with the third line blank).doc
- 戴尔1520bios(戴尔1520bios).doc
- 房产专有名词(Real estate terminology).doc
- 房地产专业知识200问(上)(200 questions on real estate professional knowledge (Part I)).doc
- 戳脚门绝技(Stamp foot stunt).doc
- 房地产公司造价人员怎样进行成本控制(How does the Real Estate Company cost control).doc
- 新高考生物二轮复习讲练测第6讲 遗传的分子基础(检测) (原卷版).docx
- 新高考生物二轮复习讲练测第12讲 生物与环境(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第3讲 酶和ATP(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第9讲 神经调节与体液调节(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第11讲 植物生命活动的调节(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第8讲 生物的变异、育种与进化(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第5讲 细胞的分裂、分化、衰老和死亡(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第5讲 细胞的分裂、分化、衰老和死亡(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第12讲 生物与环境(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第11讲 植物生命活动的调节(检测)(原卷版).docx
文档评论(0)