网站大量收购独家精品文档,联系QQ:2885784924

新时达step调试资料(Step step debugging information).doc

新时达step调试资料(Step step debugging information).doc

  1. 1、本文档共28页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
新时达step调试资料(Step step debugging information)

新时达step调试资料(Step step debugging information) Serial system debugging instructions (take F board as an example) Elevator debugging notes All the elevator installation, commissioning must pay attention to safety, comply with safety operation standards. Two. Elevator comfort factors are mainly related: 1. mechanical factors, such as rail verticality, surface smoothness, connection, guide shoe elasticity, steel rope tension and so on Set the relevant parameters of 2. operation curve; (acceleration, deceleration, S curve corner time delay starting the brake, parking brake delay etc.) 3. vector control related PI parameter settings. (proportional gain, integral time, etc.) If there are problems in the mechanical system, the main board parameters and inverter parameters can only make comfort better, and can not fundamentally change the mechanical defects. Three. Comfort indicators 1., elevator starting comfort, starting smoothly, there is no sense of step, vibration, etc.; 2. elevator high-speed operation, comfort, high speed operation is stable, whether or not vibration, sloshing, etc.; 3., elevator parking comfort, level parking is stable, can be * * * system, vibration and so on; The above three points of comfort must be considered and debugged. Four, elevator debugging process overview and main points 1., line inspection, including: before power transmission line inspection, after power line inspection 2. setting machine, setting, spinning, installation, parameter setting, automatic setting of traction machine 3. train operation safety circuit, door lock circuit, the upper and lower limit, and strong slow 4. wells, learning wells, switches, leveling sensors, well path learning, well track learning data preservation 5. train single and double, multilayer, top and bottom, top bottom test 6. comfort adjustment, mechanical adjustment, operation curve setting, speed loop PI value (current loop PI value) 7. function check, according to the contract requirements, test each st

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档