网站大量收购独家精品文档,联系QQ:2885784924

施工员试题精选(Selection of builders questions).doc

施工员试题精选(Selection of builders questions).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工员试题精选(Selection of builders questions)

施工员试题精选(Selection of builders questions) Selected works of construction workers (1) C Test Editor: Hot thea update: June 18, 2012 [comment] I. radio questions: L, a trench by slope excavation, the slope is l:0.25, such as the foundation width is 800mm, depth of 2m line size (C). A 800, B 1300, C 1800, D 2800 2, gravel or blasting ballast as filler, the maximum diameter of each layer shall not exceed the paving thickness (A). A 2 / 3, B, L / 2, C 2 / 5, D 1 / 3 3, the masonry of the central axis allows for bias (D) mm. A 20, B 15, C 12, D 10 4, when the scaffold adopts lap joint laying, its lap length should be greater than (B) mm. A 200, B 300, C 400, D 500 5. One of the quality requirements of electroslag pressure welding is that the axial deviation shall not be greater than (D) the diameter of the reinforcement and shall not be greater than 2mm. A 1 / 2 B L / 4 C L / 8 D 1/lO 6. The spacing between the ends of the reinforcement joint and the bending point of the steel bar shall not be less than (C) times of the diameter of the steel bar. A 15, B 12, C 10, D 8 7, the cranes three main working parameters are (C). A motor power, lifting height, working range, B lifting height, working range, maximum lifting weight C lifting capacity, lifting height, working range, D lifting height, working range, motor speed 8, in order to control plastering smoothness and perpendicularity should be (C). A hanging line, B elastic line, C made Grey Cake, punching rib, D layered plastering 9, paint brushing should be (C). A dip dipped in each brush, B dipped in long brush, C dip dipped in long brush. D brushing at will 10, when the roof slope is within 3 to 5%, the C can be laid on the ridge of the roof. A parallel, B vertical, C parallel or vertical, D arbitrary 11, the degree of wall construction joints should stay in the outer surface of the floor above not less than (A) mm. A 300, B 200, C 150, D 120 12, winter construction mixing mortar should adopt two step feeding method. The te

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档