- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工员试题精选(Selection of builders questions)
施工员试题精选(Selection of builders questions)
Selected works of construction workers (1)
C Test Editor: Hot thea update: June 18, 2012 [comment]
I. radio questions:
L, a trench by slope excavation, the slope is l:0.25, such as the foundation width is 800mm, depth of 2m line size (C).
A 800, B 1300, C 1800, D 2800
2, gravel or blasting ballast as filler, the maximum diameter of each layer shall not exceed the paving thickness (A).
A 2 / 3, B, L / 2, C 2 / 5, D 1 / 3
3, the masonry of the central axis allows for bias (D) mm.
A 20, B 15, C 12, D 10
4, when the scaffold adopts lap joint laying, its lap length should be greater than (B) mm.
A 200, B 300, C 400, D 500
5. One of the quality requirements of electroslag pressure welding is that the axial deviation shall not be greater than (D) the diameter of the reinforcement and shall not be greater than 2mm.
A 1 / 2 B L / 4 C L / 8 D 1/lO
6. The spacing between the ends of the reinforcement joint and the bending point of the steel bar shall not be less than (C) times of the diameter of the steel bar.
A 15, B 12, C 10, D 8
7, the cranes three main working parameters are (C).
A motor power, lifting height, working range, B lifting height, working range, maximum lifting weight
C lifting capacity, lifting height, working range, D lifting height, working range, motor speed
8, in order to control plastering smoothness and perpendicularity should be (C).
A hanging line, B elastic line, C made Grey Cake, punching rib, D layered plastering
9, paint brushing should be (C).
A dip dipped in each brush, B dipped in long brush, C dip dipped in long brush. D brushing at will
10, when the roof slope is within 3 to 5%, the C can be laid on the ridge of the roof.
A parallel, B vertical, C parallel or vertical, D arbitrary
11, the degree of wall construction joints should stay in the outer surface of the floor above not less than (A) mm.
A 300, B 200, C 150, D 120
12, winter construction mixing mortar should adopt two step feeding method. The te
您可能关注的文档
- 壁纸叫板乳胶漆(Wallpaper challenge latex paint).doc
- 声律启蒙(Sound of Enlightenment).doc
- 战场女武神3 兵种熟练度(Battlefield skills of 3 armed women).doc
- 战后德国贸易(Postwar German trade).doc
- 截句(four-line poem with the third line blank).doc
- 戴尔1520bios(戴尔1520bios).doc
- 房产专有名词(Real estate terminology).doc
- 房地产专业知识200问(上)(200 questions on real estate professional knowledge (Part I)).doc
- 戳脚门绝技(Stamp foot stunt).doc
- 房地产公司造价人员怎样进行成本控制(How does the Real Estate Company cost control).doc
- 施工心得(Construction experience).doc
- 施工图制作的规范(Specifications for construction drawings).doc
- 施工图纸1(Construction drawing 1).doc
- 施工项目安全生产、文明施工保证计划(Construction project safety production and civilized construction guarantee plan).doc
- 施工放样作业(Construction lofting).doc
- 旅游管理毕业论文(Graduation thesis of Tourism Management).doc
- 施工放线步骤(Construction release procedure).doc
- 旅游证的考取(Admission of tourist card).doc
- 旅游酒店管理毕业论文、导游论文-酒店管理论文70旅游管理论文(范文)(Turisthotellet management thesis, tour guide thesis - hotel management thesis 70, tourism management paper (model essay)).doc
- 旅游酒店公共区域卫生工作标准(Turisthotellet public regional health work standard).doc
文档评论(0)