网站大量收购独家精品文档,联系QQ:2885784924

施工放样作业(Construction lofting).doc

  1. 1、本文档共23页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工放样作业(Construction lofting)

施工放样作业(Construction lofting) Setting out work (1) Construction lofting (1) construction survey lofting process flow diagram; (two) construction survey lofting method and requirements; I. instructions The guide book is written according to the conventional method of lofting, lofting personnel must according to the actual situation, such as precision, the distribution of control points, the existing equipment, site conditions, calculation tool to select the measurement site and lofting points Different combinations of different design methods and different methods of nuclear examination. Different project and the same project of different stages, different parts of the lofting site accuracy requirements are different, so the accuracy requirements of the site and lofting points are not the same. During the operation, please strictly implement the engineering survey specifications, highway construction survey specifications and construction survey control procedures. The restriction mentioned in this book refers to the limitation of the specification. If there are special requirements in the design, it will be carried out according to the design requirements. Two, data collection and lofting plan formulation 1. before surveying and setting out, the plane and elevation control data of the construction area shall be obtained from the legal and effective way. 2., according to the site control point signs are stable and well, and so on, the existing control point data analysis, to determine whether all or part of the control points for testing. 3., the existing control points can not meet the precision requirements, should be re layout control, the existing control point density can not meet the needs of lofting, should be encrypted according to the existing control points. 4., according to the formal design drawings, documents, modify notice of measurement lofting, not with oral notice and unauthorized drawings lofting. 5., according to the specifications and design requir

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档