高速公路桥梁主要病害原因分析及养护维修技术措施_pdf(The main reason why _pdf expressway bridge disease analysis and maintenance measures).docVIP

高速公路桥梁主要病害原因分析及养护维修技术措施_pdf(The main reason why _pdf expressway bridge disease analysis and maintenance measures).doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
高速公路桥梁主要病害原因分析及养护维修技术措施_pdf(The main reason why _pdf expressway bridge disease analysis and maintenance measures)

高速公路桥梁主要病害原因分析及养护维修技术措施_pdf(The main reason why _pdf expressway bridge disease analysis and maintenance measures) And VIP information 18O North Traffic Analysis of the causes of main diseases of Highway Bridge Measures and maintenance technology Virginia Wang (Liaoning Provincial Highway Survey and design company, Shenyang 110005) Abstract: combined with the current expressway bridge disease in our province have been analyzed, and put forward the corresponding technical measures of maintenance, to Provide technical reference of bridge maintenance and repair engineering. Keywords: bridge; maintenance; maintenance CLC number: U445.71 document code: B article number: 1673 - 6052 (2008) 05 - 0180 - 03 1 overview of early construction of the highway bridge structures have appeared in a series of In recent years, with the increase of traffic volume, especially the distresses of heavy vehicle, some diseases seriously affect the safety of the structure Continue to increase, and some problems on the conservation and management of our country, and durability. According to the recent results and our province highway bridge (5) evaluation of the 8 factors from step 4 to calculate the set form a right and that the comprehensive score. A comprehensive evaluation matrix R=[rij]. It is the Cartesian product set, UX due to anti flood disaster of bridge and culvert and selected 8 evaluation indexes A fuzzy subset of V, and said it is the mapping of F derived U standard is fuzzy concept, four grade A and set (good), B The fuzzy relation V. (good), C (general), D (difference) is a fuzzy concept, so the small (6) comprehensive evaluation. The fuzzy subset A U factors, using the method of fuzzy comprehensive evaluation on bridge anti flood capacity is off A fuzzy R transform fuzzy V for comment sets (called a basis set. Fuzzy subset evaluation level). 4. B=A. R= (BL, B2, B3, B4) summarizes and analyzes the relevant information about highway at home and abroad, According to the survey r

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档