浅析路桥施工中预应力技术的问题(Analysis of prestressed technology in construction of Luqiao).docVIP

浅析路桥施工中预应力技术的问题(Analysis of prestressed technology in construction of Luqiao).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
浅析路桥施工中预应力技术的问题(Analysis of prestressed technology in construction of Luqiao)

浅析路桥施工中预应力技术的问题(Analysis of prestressed technology in construction of Luqiao) Abstract: This article has carried on the massive investigation and the analysis, has proposed several technical questions to the construction in the prestressing force. Key words: prestressed bridge; prestressed technology; crack disease CLC number: U448.14, document identification code: A According to the highway bridge health inspection situation in our country, the crack disease of the prestressed bridge is quite common, especially the box girder bridge. There are many causes of cracks, of which several prestressed technical problems appeared in the construction of prestressed bridges have been concerned and questioned by many experts. First, the prestressed bridge construction technology problems (1) the time of tensioning of prestressed concrete; In order to improve the early strength of prestressed concrete, in recent years by adding early strength agent method, general pouring concrete 3D after the beginning of prestressed concrete strength, but because growth requires a certain period of time, but also increase the strength and elastic modulus is not synchronous, fast increase of strength, the elastic modulus of concrete early deformation of long slow. Large, early tensioned prestress loss will make the increase, causing the bridge bearing capacity is insufficient, and the emergence of many cracks. In addition, the actual strength of concrete can be replaced by the early concrete strength measured by field test blocks, which also has some problems. The test shows that the actual strength of the structure is not up to the field measured, and sometimes even very low. (two) the tensioning process of one end of prestressed extra long beam Domestic long span (3~5 per span, span 30 ~ 50m) prestressed continuous box girder of prestressed beam using one end stretching process, such as a box girder bridge with 5 spans, the first span 66m, second span 88m, third cross 150m, such as the use

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档