analysis of housing construction in the quality control(房屋建筑的质量控制分析).docVIP

analysis of housing construction in the quality control(房屋建筑的质量控制分析).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
analysis of housing construction in the quality control(房屋建筑的质量控制分析)

Analysis of housing construction in the quality control [Abstract] This paper analyzes housing construction FAQ construction, discusses the quality control of building construction features, factors and control methods. [Keywords:] housing construction quality control A housing construction quality control features 1.1 characteristics of housing construction projects: 1.1.1 one. The construction of housing construction projects are not reversible, therefore, the construction of housing construction projects can only be a success, not failure. 1.1.2 fixity and mobility of production Housing construction projects should be fixed at the designated locations on the land, after all the construction projects, the construction unit in place by the transfer to the use of units. 1.1.3 a single piece. Each housing construction projects should be combined and the surrounding environment due to the environment, the foundation bearing capacity of the changes, only a single design and production. 1.1.4 bulky nature of the Housing construction project is a large number of engineering materials, products and equipment, consisting of physical, bulky, external housing account for a large space, so the only open-air production, the quality of climate and environment greater impact. 1.1.5 Appointment of Housing engineered products like industrial products in general, as can be, Mr. postpartum transactions, it can only be based on predetermined conditions in the field of production, that is, the first transaction after the production. 1.2 Quality of housing construction features: 1.2.1 is affected by many factors. The quality of housing construction works by a variety of factors, therefore, the project’s construction quality control must take into account these factors. 1.2.2 the quality and volatile. As housing construction single-piece production and mobility, general industrial production does not have a fixed production lin

您可能关注的文档

文档评论(0)

jiupshaieuk12 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6212135231000003

1亿VIP精品文档

相关文档