网站大量收购独家精品文档,联系QQ:2885784924

Analysis of the Analysis of engineering pros and cons of BOQ(分析BOQ工程利弊的分析).doc

Analysis of the Analysis of engineering pros and cons of BOQ(分析BOQ工程利弊的分析).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Analysis of the Analysis of engineering pros and cons of BOQ(分析BOQ工程利弊的分析)

Analysis of the Analysis of engineering pros and cons of BOQ [Paper Keywords] the Bill of Quantities [Abstract] China’s rapid economic and technological development, construction cost pricing model gradually from the list of fixed pricing model to the pricing model change. Fixed pricing model is essentially a form of social engineering cost the average price does not reflect the actual consumption of competing and technology management, mandatory too strong, to some extent restricted fair competition. inventory valuation method has many advantages, it is worth popularizing, but it also has shortcomings, need to constantly improve. BOQ performance of the proposed project is part of the project items, measures the project, project name and corresponding number of details list by tender in accordance with lt;lt;valuation normsgt;gt; appendix unified project code, project name, units of measurement and preparation of engineering calculation rules, including the list of sub-part of the project, measures the list of items, other items list. Quantities: is completed by the bidders from the tender to provide a list of quantities required for the full cost, including sub- part of the project costs, measure project costs, project costs and other fees, taxes. BOQ pricing model to determine the project cost of the program are: in construction project bidding, the tender pursuant to the construction drawings, tender documents, uniform engineering calculation rules and regulations into a unified project, to provide engineering for the number of bidders list bidders based on the enterprises of the consumption standard, profit targets, combined with practical engineering, market competition and corporate strength, and take into account all risk factors , completing the list of independent projects and cooperation unit price, including direct project costs, indirect costs, profits and taxes. and to completion of the reported settlement price as the valuation standard, the am

文档评论(0)

jiupshaieuk12 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6212135231000003

1亿VIP精品文档

相关文档