在建工程结转固定资产管理办法(Measures for the management of fixed assets in construction projects).docVIP

在建工程结转固定资产管理办法(Measures for the management of fixed assets in construction projects).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
在建工程结转固定资产管理办法(Measures for the management of fixed assets in construction projects)

在建工程结转固定资产管理办法(Measures for the management of fixed assets in construction projects) Measures for the management of fixed assets in construction projects Background and situation Enterprises purchase and build fixed assets, whether commissioned by the construction sector, or self built, in addition to the equipment does not need to be installed, usually through the construction projects account. In some companies, due to various reasons and some objective, all or part of the engineering project has reached a predetermined state is put into use, for various reasons or intends to extend the trial production and not in accordance with the relevant regulations, the timely transfer of fixed assets accounting, the result is not reflect the real asset depreciation, should not the provision of the formation of inflated profits. Two, relevant laws and regulations 1, Ministry of Finance Building [2002]394 Promulgated the Regulations financial management of basic construction twenty-ninth stipulates: the trial operation period determined in accordance with the following provisions: the introduction of foreign equipment project construction contract according to the provisions of the trial operation period; the domestic general construction project trial operation principle in accordance with the approved design documents required for the implementation. If the trial run period of a construction project in a particular industry needs to exceed the prescribed trial run period, it shall be submitted to the approval organ of the project design document for approval. Article thirtieth: construction project design documents according to the provisions of the approved industrial projects completed, the load test (the introduction of foreign equipment project contract expiration test) or trial operation period to the normal production of qualified products, non industrial projects to meet the design requirements, can be used normally, shall timely organize acceptance, transfer of prod

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档