existing problems and countermeasures on the cost of civil works control(存在的问题及对策对土建工程的成本控制).docVIP

existing problems and countermeasures on the cost of civil works control(存在的问题及对策对土建工程的成本控制).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
existing problems and countermeasures on the cost of civil works control(存在的问题及对策对土建工程的成本控制)

Existing problems and countermeasures on the cost of civil works control Papers network: the cost of civil works, generally refers to the reproduction of fixed assets for the construction project and the formation of a one-time cost of intangible assets and circulating funds sum cost of civil works reasonably identify and effectively control project cost control mainly refers to the cost of civil works control can not only promote the optimization design, cost control within the range allowed by the construction enterprise, but also reasonable and balanced allocation among the investment projects, so that investment in construction enterprises to obtain maximum economic benefits. In recent years, with the rapid increase in the number of civil works construction project contract, civil engineering investment in the waste of resources is a serious and widespread “three excesses”. Therefore, in the control of civil engineering projects, under the premise of ensuring the quality of the project, how to effectively control of the project cost, is worth exploring. First, the cost of civil works features (a large amount to play any of the investment utility of a project, not only the physical body large majority of the cost of tens of millions, tens of millions, hundreds of millions or even billions of the high cost of the project cost The large amount of it is not only a significant impact on the significant economic interests of the parties, will have a significant impact on the macroeconomy, and therefore the decision of the special status of the cost of civil works. (Two dynamic nature of each project to be delivered from the decision-making to be completed long construction period, a variety of uncontrollable factors in expected work period, many affect the dynamic of the project cost factors, such as the price of equipment and materials, engineering changes, wage standards, interest rates etc. often change dynamically, which affects the cost of changes

您可能关注的文档

文档评论(0)

hhuiws1482 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:5024214302000003

1亿VIP精品文档

相关文档