- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
监理工程师工作总结(Summary of supervision engineer work)
监理工程师工作总结(Summary of supervision engineer work)
Classification: Water Conservancy and hydropower supervision engineer work summary size: big, medium and small
In 2008, mainly engaged in XX project supervision management. In the following, I give a brief summary of my work during the 2008:
First, the performance of duties and responsibilities
In the premise of fully absorb the experience and lessons of the supervision work in 2007 this year, our supervision work adhere to the safety first, quality first goal, and on the work of the monitoring center and the center of gravity, the completion of key tasks include:
(1) better quality control of the first stage excavation of XX, all excavation indexes are controlled within the design range, and far superior to the design control index, and the supervision effect is remarkable.
Combined with the 2007, in the construction, not only to strengthen the measurement and detection, timely treatment of less than digging, and through over excavation balance technology to increase the height of the ladder, so that the number of wrong platform greatly reduced. In quality management, greater management and depth. One is to strengthen the internal supervision of personnel management and training, to ensure that every one supervision personnel familiar with the quality control of the construction site professional points and methods, strict on site supervision personnel to perform their duties to fulfill responsibilities investigation; two is to further strengthen supervision of the quality management system of construction units and its operation, in the construction process at any time, urge the contractor to adjust the existing problems in the quality management system, and after blast analysis, the field problem must find out the reason and responsibility, the strict quality system assessment, so as to promote the steady improvement of the level of quality management.
(two) the successful completion of the first stage excavation of
您可能关注的文档
- 男士牛仔裤搭配(Jeans for men).doc
- 登陆界面和与access数据库连接(Login interface and connect to access database).doc
- 白化病 怎样预防和护理呢(How can albinism be prevented and taken care of).doc
- 病理学与病理生理学绪论习题及答案(Pathology and pathophysiology introduction, exercises and answers).doc
- 痛风、高尿酸血症与饮食治疗原则(Gout, hyperuricemia and diet treatment principle).doc
- 白手起家创业故事 四位亿万富豪创业史(Rags to riches entrepreneurship story four billionaires history).doc
- 白电百问百答(White baiwenbaida).doc
- 白糖期货--郑交所(Sugar futures - Zheng Jiao).doc
- 白癜风病理(Vitiligo pathology).doc
- 白色污染现状调查(White pollution status investigation).doc
- 2024年江西省高考政治试卷真题(含答案逐题解析).pdf
- 2025年四川省新高考八省适应性联考模拟演练(二)物理试卷(含答案详解).pdf
- 2025年四川省新高考八省适应性联考模拟演练(二)地理试卷(含答案详解).pdf
- 2024年内蒙通辽市中考化学试卷(含答案逐题解析).docx
- 2024年四川省攀枝花市中考化学试卷真题(含答案详解).docx
- (一模)长春市2025届高三质量监测(一)化学试卷(含答案).pdf
- 2024年安徽省高考政治试卷(含答案逐题解析).pdf
- (一模)长春市2025届高三质量监测(一)生物试卷(含答案).pdf
- 2024年湖南省高考政治试卷真题(含答案逐题解析).docx
- 2024年安徽省高考政治试卷(含答案逐题解析).docx
文档评论(0)