监理施工(Supervision Construction).docVIP

  1. 1、本文档共20页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
监理施工(Supervision Construction)

监理施工(Supervision Construction) Supervision rules for construction of artificial digging piles Author: Black Rose hits: 3141 The contents of these Rules shall be divided into five parts: supervision basis, supervision content, preparation before construction, quality management in construction process and acceptance of sub section of pile foundation. I. supervision basis 1. code for design of building foundations (GB50007-2002); 2. code for design of concrete structures (GB50010-2002); 3. code for seismic design of buildings (GB50011-2001); 4. technical specifications for Pile Foundations (JGJ94-94); 5. code for construction and acceptance of foundation and foundation works (GB50202-2002); 6. code for construction and acceptance of concrete structures (GB50204-2002); 7. regulations on structural design and construction of reinforced concrete high-rise buildings (JGJ3-91, partial revision, 1997); 8. high strain dynamic test for pile foundation (JGJ106-97). Two, supervision content Manual excavation pile works are shown in table 1. Manual excavation pile engineering scale table 1 Project pile diameter (mm), pile top elevation (m), design of pile length (m), concrete strength grade, pile number (root), engineering quantity (M3) remark Manual digging pile Total Description: the project is on the table according to the pile base of statistics, the rules for the supervision content for artificial hole digging pile all pile foundation engineering. Three. Preparation before construction The preparation before construction plays an important role in whether a project can guarantee the quality goal and the target of the project. Therefore, supervision personnel to the construction unit construction preparation work should also do supervision and management. 1. technical preparation For the project of artificial digging piles, the supervision personnel shall grasp and urge the construction units to complete the following materials and be familiar with the work before commenceme

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档