Supervision rules for construction of artificial digging piles
Author: Black Rose hits: 3141
The contents of these Rules shall be divided into five parts: supervision basis, supervision content, preparation before construction, quality management in construction process and acceptance of sub section of pile foundation.
I. supervision basis
1. code for design of building foundations (GB50007-2002);
2. code for design of concrete structures (GB50010-2002);
3. code for seismic design of buildings (GB50011-2001);
4. technical specifications for Pile Foundations (JGJ94-94);
5. code for construction and acceptance of foundation and foundation works (GB50202-2002);
6. code for construction and acceptance of concrete structures (GB50204-2002);
7. regulations on structural design and construction of reinforced concrete high-rise buildings (JGJ3-91, partial revision, 1997);
8. high strain dynamic test for pile foundation (JGJ106-97).
Two, supervision content
Manual excavation pile works are shown in table 1.
Manual excavation pile engineering scale table 1
Project pile diameter (mm), pile top elevation (m), design of pile length (m), concrete strength grade, pile number (root), engineering quantity (M3) remark
Manual digging pile
Total
Description: the project is on the table according to the pile base of statistics, the rules for the supervision content for artificial hole digging pile all pile foundation engineering.
Three. Preparation before construction
The preparation before construction plays an important role in whether a project can guarantee the quality goal and the target of the project. Therefore, supervision personnel to the construction unit construction preparation work should also do supervision and management.
1. technical preparation
For the project of artificial digging piles, the supervision personnel shall grasp and urge the construction units to complete the following materials and be familiar with the work before commenceme
您可能关注的文档
- 登陆界面和与access数据库连接(Login interface and connect to access database).doc
- 白化病 怎样预防和护理呢(How can albinism be prevented and taken care of).doc
- 病理学与病理生理学绪论习题及答案(Pathology and pathophysiology introduction, exercises and answers).doc
- 痛风、高尿酸血症与饮食治疗原则(Gout, hyperuricemia and diet treatment principle).doc
- 白手起家创业故事 四位亿万富豪创业史(Rags to riches entrepreneurship story four billionaires history).doc
- 白电百问百答(White baiwenbaida).doc
- 白糖期货--郑交所(Sugar futures - Zheng Jiao).doc
- 白癜风病理(Vitiligo pathology).doc
- 白色污染现状调查(White pollution status investigation).doc
- 白色污染(white pollution).doc
文档评论(0)