- 1、本文档共21页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
第一包总控dcs系统变更为(First package total control DCS system changed to)
第一包总控dcs系统变更为(First package total control DCS system changed to)
First package: total control DCS system changed to:
Serial number, equipment name, technical index, unit number 1, total control DCS system, see instruction 1, indicating: central control room, DCS control system function and configuration
(1) the central control room DCS distributed control system monitors the 16 channel video signal of the training device and the scene. The system adopts distributed structure, the redundant communication network open distributed multi station process control station (bus must be equipped with a data acquisition module, control instrument, SIEMENS PLC and other controller, in order to meet the needs of teaching), these process control station with independent function processor, each processor can function in order to complete the specific the task of programming and configuration. For process control in the field control unit the physical location of decentralized, distributed control function, system function and dispersion, monitoring and managing for the process of the human machine interface unit of the display, operation, record and management function. The system in the field of production after the commissioning, with power supply, the input and output signal can meet the production monitoring, process control, operation screen, parameter alarm, data recording and the trend of functional requirements, and the safe and reliable operation. Each set of training devices can be independently monitored and controlled by the field operation platform under the condition that the DCS is not running, so as to complete the training projects. At the same time, through the industrial Ethernet, the corresponding training equipment is connected to the OPC server, and the remote monitoring is realized in the central controller. System I/O device should display instrument, I/O module, PLC (SIEMENS S7-200), frequency converter and other devices. Total control room engineer stat
您可能关注的文档
- 空压复习(Air pressure review).doc
- 空调检查(Air condition check).doc
- 空气加湿器(Humidifier).doc
- 空调清洗规范(Specification for air conditioning cleaning).doc
- 空调机拆卸与重装机(通用方法)(Air conditioner disassembly and reassembly machine (universal method)).doc
- 空调设计问题大集合(Large collection of air conditioning design problems).doc
- 空调漏水维修案例(Air conditioning leakage maintenance case).doc
- 突击炮手册 文本文档(Assault gun manual text documentation).doc
- 突破孕育瓶颈,播种希望(Break through the bottleneck and sow the hope).doc
- 窗膜(Window).doc
文档评论(0)