测量名词解释(Interpretation of measurement nouns).docVIP

测量名词解释(Interpretation of measurement nouns).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
测量名词解释(Interpretation of measurement nouns)

测量名词解释(Interpretation of measurement nouns) 1. broken chain: a phenomenon caused by partial modification or discontinuity of the starting mileage. 2. line: in order to correct control of tunnel slope and elevation, usually in the tunnel rock every five to ten meters higher than the bottom floor mark leveling line m is called waistline 1. leading pile: easy to test and save the place of pile, lay down the control pile, called pile. 2. square eye ruler: a metal ruler used for drawing grid. 3. point instrument: an instrument for precise plotting of point, position and line. 4. fixed line survey: intersection of highway line, point of turn test is located on the ground. 5., slope selection line: initial test traverse should be as close as possible to the selected route location, this work is called slope selection line. 6. to test: measuring the horizontal distance, the first known starting point along the direction of calibration, the design length of steel tools directly on the ground, and temporary mark the end, this process is called to test. 7. difference: the difference between measured length and near measured length is called poor. 8. pile number method: when the highway curve is measured, if the pile number of the auxiliary point is the integral multiple of 20m, it is called the whole pile number method. Method: 9. grind back curve surveying with radius R and selected chord distance measuring points to liver auxiliary measures, commonly known as grinding method. 10. groove bottom pile: stake in road side pile and pile side groove, by leveling leveling, the elevation of pile top elevation is equal to the design of the tank bottom, which is called Lu Zhi picket bottom pile. 11. Road: in order to smooth drainage, road camber, camber said. 12. axis intersection pile: building location, angle of pile in the field is called the axis intersection design for pile. Thirteen Rectangular control network: composed of axis control, mostly rectangular, so called rectangular

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档