运筹学w(Operations research, w).doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
运筹学w(Operations research, w)

运筹学w(Operations research, w) Type of test paper: (A) A single choice (the title of 5 items, each item of 3 points, a total of 15 points) 1. The following statement is correct (A). A. linear programming problem, if there is an optimal solution, it must be a feasible basis solution of the base variable group B. linear programming problem must have feasible basis solution The optimal solution of the C. linear programming problem must be unique When D. simplex method is used to solve linear programming problem, every iteration base must be iterated once, and the value of the objective function will be dropped once 2, let M be a linear programming problem, and N is its dual problem, and (A) is incorrect. A.M has the optimal solution, and N does not necessarily have the optimal solution B. if both M and N have the optimal solution, the two optimal values must be equal C. if M has no feasible solution, then N has no bounded optimal solution The dual problem of D.N is M 3, in the use of test table number operation Faqiugefeiji variables, a closed loop method and the two methods (B). A. northwest corner method B. potential method C. minimum element method D. freight balance method 4, PERT network diagram, (C) expressed as the completion of a process needed for the time or resources and other data. A. node B. arc C. right D. circle 5, a tree with 7 nodes, the edge of T is exactly (B). A.5 B.6 C.7 D.8 Two, determine the title (the title of 6 items, each item of 3 points, a total of 18 points) 1, the optimal solution of the dual variable is equal to the chance cost of the slack variable of the original problem. ((to)) 2, the positive deviation variable should take positive value, and the negative deviation variable should be negative. ((wrong)) In the 3 and PERT network diagrams, the earliest completion time of the job is its earliest start time plus the scheduled time of the job. ((to)) In the 4 and PERT network diagrams, any action that consumes time or resources can be calle

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档