- 5
- 0
- 约 34页
- 2017-09-22 发布于湖北
- 举报
By connecting the processes you can avoid transportation. This also helps to cut out inventory since material can be moved downstream to the next process sooner. There is less need for work in process (material waiting to be moved). If the process speeds can not be balanced right away or if there is a changeover or other factor that causes a batch process it is still possible to bring the processes closer so that transportation is limited and Visual Management is improved. The customer only wants to pay for the minimum effort necessary to make their product. The quickest and simplest way
您可能关注的文档
最近下载
- 国网变电运维培训课件.pptx VIP
- 第四章-非线性规划及其应用.ppt VIP
- 人教版高中物理选择性必修第一册第三章2波的描述课件.ppt VIP
- 生猪屠宰兽医卫生检疫人员考试题及答案.doc VIP
- ISO19011_2026 管理体系审核指南深度解析.pptx VIP
- 人教版高中物理选择性必修第一册第三章2波的描述学案.docx VIP
- 血液内科血栓性血小板减少性紫癜教学查房|完整课件 + 配套教案.pptx VIP
- 2025至2030国内外高功率微波技术发展及应用深度调研报告.docx
- 【三年级下册语文】【人教版】课外阅读理解每日一练60篇带答案.docx VIP
- DB43∕T 3282.3-2025 智能网联道路新型基础设施建设技术导则 第3部分:移交与运维.pdf VIP
原创力文档

文档评论(0)