绿化工程的施工组织机构(Construction organization of afforestation project).docVIP

绿化工程的施工组织机构(Construction organization of afforestation project).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
绿化工程的施工组织机构(Construction organization of afforestation project)

绿化工程的施工组织机构(Construction organization of afforestation project) Chapter 1 site construction organization and deployment I. construction organization: 1, the implementation of project law construction, in accordance with the requirements of the construction of the project law, the establishment of the project manager department, the full implementation of the contract, the construction of the project organization, command, management, coordination and control. The project manager in the scientific management, high efficiency, the principle of reasonable structure, matching with the reform of pioneering spirit, rich construction experience, excellent technology, composed of hard work engineering and technical personnel and management personnel. 2, the service layer by the company matching high-quality, skilled professional team. Two, construction deployment: 1, schedule In order to complete the project as soon as possible, according to the characteristics of the project and construction capacity, quality and quantity to complete the construction task. The overall construction plan, after the first water and electricity green, after the completion of hydropower plants began planting seedlings, and then the construction of the fine parts 2 、 construction arrangement According to the design requirements and the characteristics of the project, the overall construction schedule for the completion of water and electricity, the sub projects at the same time construction, construction and greening at the same time. 3, construction deployment During the planting period, the construction vehicle carried seedlings and planted seedlings. Construction preparation, infrastructure, landscaping, construction, closing work, acceptance The second chapter is the construction management plan of Engineering Technology First, environmental protection between the duration of the project: 1, comply with national and local regulations on environmental protection, pollution control, take neces

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档