- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
教你如何验槽(Show you how to test the slot)
教你如何验槽(Show you how to test the slot)
Trough inspection, especially the technical expertise of geotechnical professionals, whether the groove is careful or not, is the key to the safety of the whole building. Every engineering and technical personnel, each of the foundation ditch, we should be cautious, there must not be any negligence, can not let any traces.
During construction, structures must be constructed for inspection of buildings requiring grade two and over two. Inspection should be done according to the following methods and procedures:
1 inspection tank must have the data and conditions:
1.1 the personnel and technicians involved in the survey, design, quality supervision, supervision, construction and construction are present;
1.2 with the basic plane and structure of the general description of the construction drawings phase of the structure;
1.3 detailed survey of geotechnical engineering investigation report;
1.4 after excavation, the bottom of the tank without air, soil (if section excavation, each section under the same conditions of good foundation).
2 can not check the groove:
One of the following conditions can not meet the basic requirements of the test tank; it is impossible to test the tank:
The 2.1 trench bottom surface and the design elevation is too large;
The 2.2 trench bottom slope, elevation difference between;
2.3 the bottom of the tank has obvious mechanical rutting marks, and the disturbance of the trough subsoil is obvious
2.4, the bottom of the tank has obvious mechanical excavation, no artificial cleaning groove, shovel teeth traces.
2.5 there is no detailed geotechnical investigation report or detailed drawings of the structural design general drawings at the site.
3 preparation before test tank:
3.1 look at the structural description and geological survey report, compare the foundation bearing capacity of the structure design and whether the supporting layer is the same as that provided by the report;
3.2 ask and see whether the
您可能关注的文档
- 工会工作论文当前国有企业工会工作面临的问题及对策研究(Study on Problems and Countermeasures of trade union work of state owned enterprises in trade union work papers).doc
- 工作总结农村信用社2004年度工作总结(Work summary of rural credit cooperatives work summary in 2004).doc
- 工作总结农村信用社半年工作总结(Work summary, half year work of rural credit cooperatives).doc
- 工作环境与待遇问题回答技巧(Working environment and treatment skills).doc
- 工具——载体说是90年代语文教改的一项重要理论成果_4351(Tool - carrier theory is an important theoretical achievement of Chinese language education reform in 90s _4351).doc
- 工厂供电 答案(Factory power answer).doc
- 工厂目视化管理(Visual management of factory).doc
- 工商管理中的全信息原则与信息开发(Full information principles and information development in Business Administration).doc
- 工程做法(Engineering practice).doc
- 工学结合的概念与模式框架----眉山职业技术学院(The concept and mode frame of work study combination ---- Meishan Vocational and Technical College).doc
文档评论(0)