浅谈先张法预应力空心板梁预制厂通用设计施工(General design and construction of pre tensioned prestressed hollow slab precast plant).doc
- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
浅谈先张法预应力空心板梁预制厂通用设计施工(General design and construction of pre tensioned prestressed hollow slab precast plant)
浅谈先张法预应力空心板梁预制厂通用设计施工(General design and construction of pre tensioned prestressed hollow slab precast plant)
DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
General design and construction of pre tensioned prestressed hollow slab precast plant
Release time: 2007-08-07
Jiang Long Wang
(Shanxi Institute of traffic Sciences, Shanxi, Taiyuan 030006)
Abstract: Abstract: the cross section types of pretensioned prestressed hollow slab beam bottom formwork design and construction, selection, tension and relaxation facilities and mixing station gantry crane, health equipment, prefabricated plant location and layout were introduced in this paper, combined with the specific practice of construction, put forward some suggestions.
Key words: pre tensioned method; prestressed hollow slab beam; prefabricated plant; design and construction
In recent years, the development of highway construction in China is swift and violent, and the prestressed concrete slab is widely used in highway bridges. Many design units are also preferred. The reason is that the utility model has the advantages of small weight, strong bearing capacity, convenient construction, and convenient centralization and prefabrication. This paper discusses the construction technology of pretensioned hollow slab in accordance with the construction practice of 5 contract of Zhang Shi Expressway in Hebei.
Section type of hollow slab beam
The design objective is to concrete hollow plate beam section at least obtain the maximum bearing capacity, so the center is usually empty of various shapes, eight sided, round, oval and so on (see Figure 1, figure 2)
Figure 1
Figure 2
The hollow plate is shown in Figure 1, the lateral mode multi shaped steel formwork, mould generally two and two wooden template, concrete pouring mode of production, but due to the inconvenience of the core mold support, demolition and concrete pourin
您可能关注的文档
- 林产工业发展与环境保护对策(Development of forest products industry and Countermeasures for environmental protection).doc
- 某公司6s项目咨询后的感想(Thoughts on 6S project consultation in a company).doc
- 柏乡(Baixiang).doc
- 某商场开业庆典(Opening ceremony of a shopping mall).doc
- 某大学夏季运动会策划书全方案(Planning a university summer games full program).doc
- 某工程人防地下室设计若干问题探讨(Discussion on Design of civil air defense basement of a project).doc
- 某白酒企业网络招商经典案例分析(Classic case analysis of a liquor enterprise online merchants).doc
- 某某街道加强三资管理 夯实党建基础(Certain streets strengthening the management of three funds to consolidate the foundation of Party Building).doc
- 某领导谈离退休工作(A leader talks about retirement work).doc
- 柒牌错位的品牌喧嚣(Qipai brand noisy dislocation).doc
- 职业技术学院2024级工业机器人技术(安装与维护)专业人才培养方案.docx
- 职业技术学院2024级应用化工技术专业人才培养方案.pdf
- 职业技术学院2024级软件技术(前端开发)专业人才培养方案.pdf
- 职业技术学院2024软件技术专业人才培养方案.docx
- 职业技术学院2024级信息安全技术应用(安全运维)专业人才培养方案.docx
- 职业技术学院2024级新能源汽车检测与维修技术(车辆鉴定与评估)专业人才培养方案.pdf
- 职业技术学院2024级石油炼制技术专业人才培养方案.pdf
- 职业技术学院2024级环境监测技术专业人才培养方案.docx
- 职业技术学院2024级汽车制造与试验技术专业人才培养方案.pdf
- 职业技术学院2024级信息安全技术应用专业人才培养方案.pdf
文档评论(0)