煤炭采制样管理办法(The measures for the administration of coal sampling).docVIP

  • 3
  • 0
  • 约1.16万字
  • 约 11页
  • 2017-10-07 发布于河南
  • 举报

煤炭采制样管理办法(The measures for the administration of coal sampling).doc

煤炭采制样管理办法(The measures for the administration of coal sampling)

煤炭采制样管理办法(The measures for the administration of coal sampling) 1 Purpose 2 scope of application 3 citation criteria The terms in the following documents are referenced by this standard and become the provisions of this standard. Fordated documents, subsequent amendments (excluding corrections) or revisions do not apply to this standard, however, encourage the latest version of the parties to agreements based on this standard using these files. Any undated reference document whose latest edition is applicable to this standard. 3.1 citation criteria Measures for commercial coal samples GB475 - 1996 Preparation method of coal sample GB474 - 1996 Method for determination of total moisture in coal -- GB/T 211 - 1996 Methods for industrial analysis of coal GB/T212 - 2001 Method for determination of calorific value of coal GB/T213 - 2003 Method for determination of total sulfur in coal GB/T214 - 1996 Determination of fusibility of coal ash - GB/T219 - 1996 4 technical terms 4.1, mining, production and Transformation: in accordance with the prescribed method to take representative coal samples, and its preparation and testing process. 4.2 standard coal sample: coal sample with high uniformity, good stability and accurate quantity. 4.3 certification: the verification in this standard refers to the assessment of the accuracy and accuracy of instruments and equipment by the authorized inspection departments of the state. 4.4 calibration: refers to the use of standard material on the accuracy of the instrument check. 5 executive program 5.1 sampling of incoming coal 5.1.1 coal sample must adopt GB475 - 1996 commercial coal sample. 5.1.2 samples are ready for sampling 30 minutes before coal comes into the plant. 5.1.3 direct coal feeder must be sampled at three points per vehicle. 5.1.4 coal transportation plants shall be sampled in the conveyor stream during loading and unloading of coal. 5.1.5 automobile coal plant can be sampled at three point cycle mode, and also can be sam

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档