常见暖通空调设计知识及问题点汇总(Common HVAC design knowledge and problem summary)

常见暖通空调设计知识及问题点汇总(Common HVAC design knowledge and problem summary) 1, pump in the system design position: In general, chilled water pump water chiller should be located in the front, back from the end of the chilled water through the chilled water pump to water chiller; cooling water pump in the cooling water into the water from the cooling unit, cooling water pump cooling tower out of the back to the unit; hot water circulating pump in the return water pipe, hot water after come back from the end hot water circulating pump to heat exchanger. 2. Valve design on cooling tower: 2, 1 cooling tower inlet pipe with solenoid valve (do not advocate the use of manual valve) 2, 2 pipe drain valve should be installed in the room, (if placed outside, because the pipe has some water storage, winter easily frozen) 3 、 installation position of electronic water treatment instrument Place it behind the pump, in front of the main engine. 4. Valve before and after filter Filter front and rear pressure gauge. 5 、 valve before and after water pump 5, 1 pump inlet pipe in turn: butterfly valve - pressure gauge - soft connection 5, 2 pump pipe outlet in turn: soft - pressure meter - check valve - butterfly valve 6, diversity water Between 6 and 1 water tanks, an electric pressure differential bypass valve and a bypass pipe (usually DN50) are used A thermometer shall be provided on the return pipe of the 6 and 2 water collecting devices 7, all kinds of instrument layout position: thermometer, pressure gauge and other instruments should be in place for observation, the general height of valve from 1.21.5m, above this height, should set up a working platform. 8, the unit position between two compressors projection distance less than 1.0m, between the refrigerator and the wall of the main channel and non distance distance not less than 0.8m, the large and medium-sized refrigeration unit (centrifugal, screw, absorption refrigeration machine) the distance is 1.52.0m. The upper part of the refr

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档