收集到的意见SuggestionsReceived.ppt

  1. 1、本文档共73页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
收集到的意見 Suggestions Received 16 份意見書 16 submissions 收集到的意見(按類別) Suggestions Received (By Type) Traffic Demand 交通需求- 1 (海港商界論壇 , Save our Shorelines,太古地產 )交通事項應在土地用途規劃時附帶一併及融合處理。作出任何建設新運輸基建的決定前,應先研究一切可行的方法, (Harbour Business Forum, Save our Shorelines, Swire Properties) Transport issues shall be treated as ancillary to but integrated into the land use plan making process. Any decision to build new transport infrastructure should only be taken when all viable alternatives, Traffic Demand 交通需求- 2 (續 ) 包括善用現有基建,而不應局限於交通管理和財務措施的範疇。 (Cont’d) including the intelligent use of existing infrastructure, have been examined and exhausted. Measures to resolve existing and projected traffic problems should extend beyond traffic management and fiscal measures. Traffic Demand 交通需求- 3 (商界環保協會 , Designing Hong Kong Harbour District,香港愛護動物協會 ,太古地產 )應減少及控制對土地及交通基建的新需求,以確保海濱優美;… (Business Environment Council, Designing Hong Kong Harbour District, Society for the Prevention of Cruelty to Animals (HK), Swire Properties) Initiatives to minimize and control new demand for land and transport infrastructure incompatible with harbour-front enhancement … Traffic Demand 交通需求- 4 …以及/或減少、控制對其後再一步填海的需求。應檢討現有/規劃土地用途及發展密度和程度 . … and/or the subsequent need for further reclamation, including reviewing existing and planned land uses, and development density and intensity, should be studied. Traffic Demand 交通需求- 5 (xxx) (Society For Protection Of The Harbour Limited) The projected traffic increase necessitating the need of the Bypass needs to be reviewed in view of : (a)? The uncertain extent of the part of the Central Reclamation to be completed and the reduction of the proposed commercial and office developments thereon (b)??The reduction of the extent of the Wanchai Reclamation and the proposed developments (c)?The deletion of the Green Island Reclamation (d)?The deletion of ?the Green Island Link to Lantau and the proposed Container Port

您可能关注的文档

文档评论(0)

xyl118 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档