明发通达信息港一期项目消防通风工程 施工组织设计.docVIP

  • 0
  • 0
  • 约11.64万字
  • 约 121页
  • 2017-11-07 发布于福建
  • 举报

明发通达信息港一期项目消防通风工程 施工组织设计.doc

明发通达信息港一期项目消防通风工程 施工组织设计 消防系统、通风工程 施 工 组 织 设 计 建设单位:南京明发通达电子信息技术发展有限公司 施工单位:南京市第十建筑工程有限公司 environment negative tube wiring should be used in low-voltage transmission fluid used welding galvanized steel pipe. Electrical equipment, steel pipe and steel pipe, steel pipe and steel pipe and steel pipe connection between the threaded connections should be used in the annex, shall not adopt telescopic, pipe diameter for 25mm and below should not be less than 5 buttons, exposed screw should not be too long. 4.1.12 transformer installation 4.1.12.1 check 4.1.12.1.1 before installation check: transformer installation construction bases before size and base mounting dimensions of transformer check base water level should be formed, with embedded iron should be complete, install the supplied calibration Tablet cores and elevation, the design drawings requirements. 4.1.12.1.2 transformers arrived at the scene right out of the box to check inventory of accessories and spare parts are complete, while recognizing the transformer nameplate on models, specifications, attachments, spare parts for compliance with design drawings and technical documents. Check reviews should select a sunny windless weather and surroundings clean and the grounds are dust-proof and rain measures. 4.1.12.2 checker and 4.1.12.2.1 oil: before the lifting of iron core in transformer windings should be first released part of transformer oil in the tank, the top cover seal rubber gaskets to prevent transformer oil spills when you remove fuel tank cap bolts and in so doing to prevent oil spills or spills to the ground. 4.1.12.2.2 hanging core: operators should take care to avoid objects falling into the tank, and protective measures. In the installation process to ensure that core winding smooth hanging out of the tank shall not collide with tank, against damage to the insulation, after winding up the fuel tank of the iron core, then overall on a clean 明发通达信息港一期项目消防系统、通风工程 施工组织设计 目 录 第一章 工程概况 ........

文档评论(0)

1亿VIP精品文档

相关文档