pmp考题模拟试题-完整英文版
概論 1-1-1:In comparing the Project Management Life Cycle and the Product Life Cycle, which of the followings is most true?
A:The project life cycle typically changes and evolves with the project.
B:The project management life cycle is unique to every project.
C:The project life cycle is can be referred to as the Project Management Life Cycle.
D:The product life cycle typically involves more than one project life cycle.
答案分析:
(D)The project management life cycle refers to project management process groups -initiating, planning, executing,controlling and closing. The project management cycle is applicable to each phase of the project life cycle. The Product Life Cycle typically involves more than one project,and therefore more than one Project Life Cycle.
概論 1-1-2:Which of the followings are not included in the main Project Management processes?
A:Feasibility
B:Executing
C:Planning
D:Closing
答案分析:
(A)Feasibility may well be an activity or stage within the project. The key point here is that it isnt one of the 5 recognized PMI Project Management processes.
概論 1-1-3:Which of the following statements is true?
A:Properly operated projects often go
through progressive elaboration,
not remaining fixed even though
the scope has been defined and agreed.
B:The project to create the Shanxia (Three-Gorges)Dam cant be considered temporary because of the operations such as power generation,transformation of electric power,transporation,etc. are following after the Dam has been completed.
C:Projects can go on indefinitely
when there is support and maintenance involved.
D:Projects are not unique because
there is always some aspect that
has been done before.
答案分析:
(A)Projects are unique and temporary.
Support and maintenance would not be part of the Project Life Cycle although it could be part of a product Life Cycle. The product may last a long time(e.g. Shanxia Dam)but the project to produce it was temporary. One of the natures of the project is that it has a definite beginning
您可能关注的文档
- Non-conforming Product Control Procedure中英.doc
- NOKIA手机后壳塑件注射成型工艺与模具设计的毕业论文.doc
- NIS医院感染实时监测预警系统.ppt
- NOIP初赛复习练习.ppt
- NoteExpress文献检索与管理.ppt
- NPC技术工法.doc
- nuan楞次定律.ppt
- numeca 的中文帮助文件帮助文档.doc
- NVH行业资料.docx
- NS防火墙部署方案介绍.ppt
- 5《老师 您好》教学设计-2024-2025学年道德与法治一年级上册统编版.docx
- 8.3俄罗斯第二课时教学设计-2023-2024学年湘教版地理七年级下册.docx
- 东方汽轮机厂校园招聘85人公开引进高层次人才和急需紧缺人才笔试参考题库答案详解版新版.docx
- 东方通信股份有限公司校园招聘85人公开引进高层次人才和急需紧缺人才笔试参考题库答案详解版及答案一套.docx
- 中医科三基三严理论知识考试试题及答案.docx
- 2024-2025学年高中化学 第三章 水溶液中的离子平衡 第三节 盐类的水解教学设计 新人教版选修4.docx
- 全国山西经济版小学信息技术第一册第三单元活动2《小蘑菇》教学设计.docx
- 第3课 我很诚实 教学设计-2023-2024学年道德与法治三年级下册统编版.docx
- 东莞华科电子有限公司校园招聘85人公开引进高层次人才和急需紧缺人才笔试参考题库答案详解版审定版.docx
- 二年级下册科学教学设计-1.前后左右 青岛版(六年制).docx
文档评论(0)