- 1、本文档共173页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
pmp考题模拟试题-完整英文版
概論 1-1-1:In comparing the Project Management Life Cycle and the Product Life Cycle, which of the followings is most true?
A:The project life cycle typically changes and evolves with the project.
B:The project management life cycle is unique to every project.
C:The project life cycle is can be referred to as the Project Management Life Cycle.
D:The product life cycle typically involves more than one project life cycle.
答案分析:
(D)The project management life cycle refers to project management process groups -initiating, planning, executing,controlling and closing. The project management cycle is applicable to each phase of the project life cycle. The Product Life Cycle typically involves more than one project,and therefore more than one Project Life Cycle.
概論 1-1-2:Which of the followings are not included in the main Project Management processes?
A:Feasibility
B:Executing
C:Planning
D:Closing
答案分析:
(A)Feasibility may well be an activity or stage within the project. The key point here is that it isnt one of the 5 recognized PMI Project Management processes.
概論 1-1-3:Which of the following statements is true?
A:Properly operated projects often go
through progressive elaboration,
not remaining fixed even though
the scope has been defined and agreed.
B:The project to create the Shanxia (Three-Gorges)Dam cant be considered temporary because of the operations such as power generation,transformation of electric power,transporation,etc. are following after the Dam has been completed.
C:Projects can go on indefinitely
when there is support and maintenance involved.
D:Projects are not unique because
there is always some aspect that
has been done before.
答案分析:
(A)Projects are unique and temporary.
Support and maintenance would not be part of the Project Life Cycle although it could be part of a product Life Cycle. The product may last a long time(e.g. Shanxia Dam)but the project to produce it was temporary. One of the natures of the project is that it has a definite beginning
您可能关注的文档
- Non-conforming Product Control Procedure中英.doc
- NOKIA手机后壳塑件注射成型工艺与模具设计的毕业论文.doc
- NIS医院感染实时监测预警系统.ppt
- NOIP初赛复习练习.ppt
- NoteExpress文献检索与管理.ppt
- NPC技术工法.doc
- nuan楞次定律.ppt
- numeca 的中文帮助文件帮助文档.doc
- NVH行业资料.docx
- NS防火墙部署方案介绍.ppt
- (4篇)XX区抓党建促基层治理培训心得体会汇编12.docx
- 汇编1154期-在培训班上的讲话汇编(3篇).doc
- 汇编1173期-专题党课讲稿汇编(3篇)112.doc
- 汇编1076期-主题党课讲稿汇编(3篇).doc
- 汇编1177期-学习心得体会汇编(3篇)112.doc
- (6篇)党和国家机构改革心得体会汇编.docx
- 汇编1166期-坚定理想信念、全面从严治党、担当作为专题党课讲稿汇编(3篇)112.doc
- 汇编1174期-专题党课讲稿汇编(3篇)112.doc
- 教育13期-主题教育学习心得体会、研讨发言材料参考汇编(3篇).doc
- 汇编1458期-心得体会研讨发言提纲参考汇编(3篇)123.doc
最近下载
- 露天非煤矿山施工方案.docx VIP
- 标准图集-13G322-1-钢筋混凝土过梁 - 烧结普通砖、蕉压灰砂翩。蒸压粉煤灰砖砌体.pdf
- 危大工程-模板工程及支撑体系-安全管理措施.doc VIP
- 高中历史选择性必修3《文化交流与传播》教学设计(修订版).doc
- 废水处理可行性研究报告.docx VIP
- 统编人教部编版小学语文四年级下册语文第二单元测试卷A(附答案).docx VIP
- GB-55015 空气源热泵技术解读-2024制冷展.pdf
- 2025年郑州旅游职业学院单招职业技能测试题库必考题.docx VIP
- 基于PLC的教室照明自控系统设计.doc
- GB50175-2014 露天煤矿工程质量验收规范.docx
文档评论(0)