LEED GA考试模拟试题.doc

  1. 1、本文档共28页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
LEED GA考试模拟试题

1、How can a project earn Regional Priority credits? a) By satisfying the requirements for the Regional Materials credit b) Using only local vendors c) By addressing geographically specific environmental priorities d) By satisfying LEED credits labeled as a priority by the state the project is in Correct answer(s): c Explanation: See the Intent section under Regional Priority Credit 1 in any LEED Reference Guide Regional Priority credits are listed by zip code (not state) on the USGBC website. Category: GA: Stakeholder Involvement in Innovation 2、Which of the following is NOT a responsibliity of the Commissioning Authority (CxA) as it relates to LEED? a) Develop and incorporate commissioning requirements into the construction documents b) Develop the Basis of Design (BOD) c) Develop and implement a commissioning plan d) Verify the installation and performance of the systems to be commissioned e) Complete a summary commissioning report Correct answer(s): b Explanation: See EAp1, Fundamental Commissioning of the Building Energy Systems Developing the BOD is always the responsibility of the Design Team Category: GA: Project Systems and Energy Impacts 3、At a minimum, which of the following materials should a recycling program at a completed LEED Certified building provide for? (Choose 3) a) Glass b) Ink cartridges c) Compact fluorescent bulbs d) Plastics e) Corrugated cardboard Correct answer(s): a,d,e Explanation: While LEED encourages all recycling, projects are only required to provide for the recycling of glass, plastics, metals, paper and cardboard. Category: GA: Acquisition, Installation, and Management of Project Materials 4、Which of the following building materials would NOT contain recycled content? a) acoustical ceiling tiles b) carpet tile c) linoleum flooring d) granite countertops e) structural steel beams f) metal studs Correct answer(s): d Explanation: Granite is stone that is mined, cut, and polish

文档评论(0)

153****9595 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档