防腐施工技术要求-英文翻译.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
防腐施工技术要求-英文翻译

Basis for preparation HGJ229-91 Code for Construction and Acceptance of Industrial Equipment and Piping Anti-corrosion Works SHJ 22-90 Design and Construction Code for Anti-corrosion Coating on Equipment and Piping in Petrochemical Enterprises SYJ4020-88 Design and Construction Code for Oil Asphalt Anti-corrosion Coating on Embedded Steel Pipes SYJ4007-86 Code for Steel Surface Preparation before Coating GB50235-97 Code for Construction and Acceptance of Industrial Metallic Pipes GB8923-88 Rusting Grade and Rust Cleaning Grade of Steel Surface Before Coating YB/T9256-96 Technical Specifications of Coat Application on Steel Structures and Piping key points of quality control Review on Work Start Qualification Review on Subcontractor and Its Personnel The key points to be reviewed should include qualification certificates of the subcontractor, qualification certificates of its personnel, whether there is contracting or not by the subcontractor etc. The original qualification certificates should be provided for review and copes shall be filed for future reference. Review on Construction Organization The construction organization must be complied with the Job Specification (for example, there shall be QC inspection personnel). The construction machines and tools meet with the requirement of construction. The construction scheme should be practicable. All of the metering tools should be checked and calibrated. The qualified metering tools should be marked and recorded. The construction subcontractor should have performed safety education and technical training according to different types of work and shall provide training record. Arrival Inspection and Preparation of Raw Materials The raw materials used in construction should be in accordance with related national standards and suppliers’ standards, provided with ex-factory quality certificates and inspection reports. The name, model, color code and period of validity of raw materials shall be checked. The c

文档评论(0)

xcs88858 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8130065136000003

1亿VIP精品文档

相关文档