- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
预应力混凝土简支梁桥钻孔灌注桩锥形锚具AutoCAD
预应力混凝土-简支梁桥-钻孔灌注桩-锥形锚具-AutoCAD-毕业论文
This is a partial struct design of a flyover crossing that is over the railway in GaokanShangguanbo according to designing assignment and the standard of road and bridge For the purpose of make the type of the bridge corresponding with the ambience and cost saving this paper provides two different types of bridge for selection the first one is pre-stressed concrete continuous bridge the second one is double cantilever half through no-thrust arch bridge After the comparisons of economy appearance characteristic under the strength and effect the first one is selected
In this design The checking calculation of strength of main girder was preceded not only in prestressed statement but also in using statement deflectionprecamber and the assessment of reinforcing steel bar were checked too
The pier of the bridge was basing on digging pile and adopted rubber pot bearing According to the characteristic of the overpass bridge and spot condition it adopted the method that the cantilever job placing combined with bracket job placing
All of the design drawings were protracted by AutoCAD Except that the thesis called A note on dynamic fracture of the bridge bearing due to the great Hanshin–Awaji earthquake was translated into Chinese and made a report on
Keywords prestressed concreteAutoCADsimple supported beam bridgecast-in-place pilecone anchorage device
目录
第一部分 桥梁设计 1
第一章 水文计算 1
11原始资料 1
12 水文计算 3
第二章 方案比选 6
21 方案一预应力钢筋混凝土简支梁锥型锚具 6
22方案二钢筋混凝土箱形拱桥 10
第三章 总体布置及主梁的设计 11
31设计资料及构造布置 11
32主梁内力计算 12
第四章 预应力钢束的估算及其布置 21
41跨中截面钢束的估算与确定 21
42钢束预应力损失计算 25
43截面强度验算 28
44预加内力计算 34
45主梁斜截面验算 35
46截面应力验算 41
47主梁端部的局部承压验算 46
第五章 下部结构的计算 51
51盖梁的计算 51
52桥墩墩柱计算 58
53钻孔灌注桩的设计计算 60
第二部分 英文翻译 63
Reliability analysis 63
可靠性分析 70
结束语 74
第一部分 桥梁设计
第一章 水文计算
11原始资料
111水文资料
浑河发源于辽宁省新宾县的滚马苓从东向西流过沈阳后折向西南至海城市三岔河与太子河相汇而后汇入辽河浑河干流长364公里流域面积11085平方公里本桥位上游45公里的大伙房水库于1958年建成该水库控制汇流面积5563平方公里对沈阳地区的浑河洪峰流量起到很大的削减作用
文档评论(0)