网站大量收购闲置独家精品文档,联系QQ:2885784924

加工与装配车间集成调度的多目标优化模型-计算机工程与应用.PDF

加工与装配车间集成调度的多目标优化模型-计算机工程与应用.PDF

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
加工与装配车间集成调度的多目标优化模型-计算机工程与应用

Computer Engineering and Applications 计算机工程与应用 2016 ,52(10) 247 加工与装配车间集成调度的多目标优化模型 梁艳杰,杨明顺,高新勤,巴 黎,雷丰丹 LIANG Yanjie, YANG Mingshun, GAO Xinqin, BA Li, LEI Fengdan 西安理工大学 机械与精密仪器工程学院,西安 710048 Faculty of Mechanical and Precision Instrument Engineering, Xi ’an University of Technology, Xi ’an 710048, China LIANG Yanjie, YANG Mingshun, GAO Xinqin, et al. Multi-objective optimizing model for solving mixed model shop of fabrication and assembly. Computer Engineering and Applications, 2016, 52 (10):247-253. Abstract :The integrated optimization problems for mixed model shop, which composed of a kind of coordinated scheduling for job shop and flow shop with assembly are investigated. Multi-objectives are considered simultaneously: minimizing the make-span in the job shop and minimizing the total make-span in assembly line, in order to ensure the inventory of work piece in process of buffers and reduce the waiting time in assembly line, consider the penalty for the earlier completion in fabrication line and wait in assembly line. The multi-objective integrated of mixed shop model is presented. It takes advantage of the parallelism between fabrication and assembly to determine the sequence of fabrication processing and assembly and cuts down the make-span of production, reduces the processing cost and improves the rate of equipment uti- lization. The multi-objective GA is designed for solving the scheduling problem, in which the two-section real number encoding method is put forward, the select, crossover, mutation operations and the elitist strategy are designed to ensure the priority in processing and avoid the effect of infeasible solution. And finally, an example from freezer production is given to test the model and algorithms presented herein. The results show that the model is effective and excellent. Key words :fabrication and assembly; integ

文档评论(0)

laolao123 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档