- 1、本文档共46页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
山东青岛郊洲湾跨海大桥长度4152公里世界之最JiaozhouBay
The Lake Pontchartrain Causeway in Louisiana, which had the title until December 27 of the last year, for its longest span, has now been dwarfed by three miles, by the new bridge that has a massive 26.4 miles span–five miles more than the distance between Dover and Calais. Expressing in another way, the Qingdao Haiwan Bridge is 174 times longer than the famous London’s Tower Bridge over the river Thames. /?utm_source=feedburnerutm_medium=feedutm_campaign=Feed%3A+tr-politics+(Politics+articles+at+Technorati)#ixzz1QomSEMr1 A band plays during the opening ceremony of the Qingdao Jiaozhou Bay Bridge in Qingdao, Shandong province Thursday June 30, 2011. 集團公司董事長孫亮在通車典禮儀式上致辭 2011年6月30日﹐電視記者在青島膠州灣大橋紅島互通立交上現場報導。新華社記者 李紫恆 攝 Flowers and souvenir will be given to the first vehicle runs into toll station to the applause of staff and passers-by after the bridge opened to traffic today. Qingdao Jiaozhou Bay Bridge 1.Total investment﹕ US$ 550,000,000 2. Recovery period: 22 years 3. Form of cooperation﹕ BOT , joint venture 4. Brief account of the Chinese partner﹕ Qingdao International Trust Investment Company, founded in 1993, is a local banking institution powerful in investment and financing. By the end of 1997, it had RMB 3,509 billion of total assets (including $175.08 of foreign currency assets). 5. Project details: The Jiaozhou Bay Bridge is designed to be a communication link connecting Qingdao Economic Technical Development Zone and eastern Qingdao. It is designed to be totally 20 kilometers long, and the section above the sea is 16 kilometers long with a width of 29 meters. The span of the main section of the bridge is 180 meters to enable the passage of vessels of 20,000 tons. The bridge deck will be constructed using reinforced concrete supported on T shape columns. 6. Market situation: After the bridge being completed, the distance between Qingdao and Huangdao will be 100 kilometers shorter than the existing land route and 70 kilometers shorter than the J
您可能关注的文档
- 定基线双目视觉开发套件--V31.PDF
- 定理1常数函数的导数.PPT
- 定线-道路勘测设计.PDF
- 定量发注方式发注点方式.PDF
- 宜兰105学年国民中学技艺教育课程设计职群学生技艺竞赛实施.PDF
- 宜兰农田水利会参访他会水利设施宜兰农田水利会吕会长率领会务.DOC
- 宜昌商业步行街活动方案-湖北策划行业协会.PDF
- 宜都第一人民医院.DOC
- 宜兰绿色博览会.PPT
- 宝山区长江路小学学科计划任教学科数学教师姓名钱芳任教班级.DOC
- 国开景区管理作业2试题及答案.pdf
- 国开景区管理作业1-4试题及答案.pdf
- 河南开放大学本科《地域文化(本)》作业练习1-3试题及答案.pdf
- 2024年大型游乐设施操作证考试题库及答案很全.pdf
- 2024年门座式起重机司机考试题库及答案.pdf
- 2022-2023学年河北省衡水市武强中学高二(下)期末数学试卷【答案版】.docx
- 2022-2023学年河北省保定市崇德实验中学高二(下)期末数学试卷【答案版】.docx
- 江西省2017年中小学教师招聘考试高中化学试卷及答案.docx
- 2024年河北省八年级中考生物真题(解析版).docx
- 2024年南阳市社会保险中心(唐河县企业养老保险分中心)(参公)一级科员招录1人《行政职业能力测验》高频考点、难点(答案详解版).docx
文档评论(0)