- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
NAME OF CONSTRUCTION Author of the slides XXX的幻灯片XXX建设作者的名字.ppt
Case study no. X Case study no. XXX TERME ZRE?E, HOTEL DOBRAVAAuthor of the slides: Assoc.Prof.Dr. Miroslav Premrov, University of Maribor, Faculty of Civil EngineeringCase study no. 8 Leonardo da Vinci project no. CZ/06/B/F/PP-168007 WP6 – Case Studies PC 3 – A set of case studies Content of slides 1. General information 2. Bearing system 3. Actions on structures 4. Erection 5. Interesting construction details 1. General information Date: 5.7.1999 Price: approx. 12 mil. EUR Investor: Unior,d.d., Kova?ka c. 21, Zre?e, Slovenia Design studio: Karlov?ek d.o.o., ul. Antona Skoka 7, Dom?ale, Slovenia Construction company: Lumar Hi?e d.o.o., ?matev? 26, Gomilsko, Slovenia Location: Zre?e, Slovenia Materials used: reinforced concrete, timber 2. Bearing system 2.1. General description The structure is 6-level building with overall ground-plan dimensions of 38 x 18,60 m. The first two levels are classical - made from reinforced concrete, while the upper four consist of prefabricated timber elements. 2.2. Prefabricated wall elements 2.3. Reinforcing of wall elements in the first and second level 2.4. Prefabricated floor elements 3. Actions on structure Actions on structures according to in year 1999 valid Slovenian standards. 1. Dead load 2. Live load p = 1.50 kN/m2 3. Snow s = 1.25 kN/m2 4. Wind w0 = 0.60 kN/m2 5. Seismic force VII. MCS 4. Erection The first part of the building with the underground level and the ground-floor was built completely classical with a reinforced concrete of a strength class C20/25 and steel class S400 and S500. The second part of the building, the rest four levels, were constructed using s.c. prefabricated platform timber system with the timber-framed walls (Fig. 3) and the floor elements (Fig. 4). They were completely constructed in the assembly-plant and then as final products transported to the building-site. 5. Interesting construction detai
您可能关注的文档
- FINANCIAL MARKETS AND INSTITIUTIONS A Modern …金融市场和institiutions现代….ppt
- Direct Marketing - Southern Methodist University - World 直接营销-南卫理公会大学-世界.ppt
- 2012届创新设计历史一轮复习配套课件:古代中国的发明和发现.ppt
- 【走向高考】数学人教新课标A版(课件):第9篇2-2.ppt
- 电子教案(一维数组).ppt
- 第八章 领导理论【管理经典】.ppt
- 人力资源必修-【课件】平衡记分卡-吕 剑 1999年.ppt
- Anomaly Detection - Kanwal Rekhi:异常检测Kanwal雷基.ppt
- 2012届高考复习语文课件(人教版山西用)第3部分第1章第2节 正确使用熟语(成语).ppt
- 激励培训[最牛员工激励理论].ppt
- 商业银行经营管理7【企业经营管理推荐】.ppt
- 地理:第29讲 中国地理差异.ppt
- 14章精神障碍 2学时.ppt
- 单片机最小 系统【企业广告传媒】.ppt
- Eta production Resonances, meson couplings and … exotic - CFTPη产生共振,介子联轴器和……异域CFTP.ppt
- 2012届高考复习政治课件(人教山西用)必修2第1单元第2课第3课时 民主管理:共创幸福生活.ppt
- 了解相应的证明方法。 2 熟悉二叉树的各种存储结构的特点.ppt
- Multilevel Simulation of Discrete Network Models - Drew Hamilton多级模拟离散网络模型-德鲁汉密尔顿.ppt
- 2012届高考语文二轮复习精品课件(湖南专用)第6课时 文言翻译.ppt
- 英语:Unit 2《Healthy Eating 》课件(新人教版必修3).ppt
文档评论(0)