- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程造价专业英语
Risk Analysis of the International Construction Project
By: Paul Stanford Kupakuwana
Cost Engineering Vol. 51/No. 9 September 2009
ABSTRACT
This analysis used a case study methodology to analyse the issues surrounding the partial collapse of the roof of a building housing the headquarters of the Standards Association of Zimbabwe (SAZ). In particular, it examined the prior roles played by the team of construction professionals. The analysis revealed that the SAZ’s traditional construction project was generally characterized by high risk. There was a clear indication of the failure of a contractor and architects in preventing and/or mitigating potential construction problems as alleged by the plaintiff. It was reasonable to conclude that between them the defects should have been detected earlier and rectified in good time before the partial roof failure. It appeared justified for the plaintiff to have brought a negligence claim against both the contractor and the architects. The risk analysis facilitated, through its multi-dimensional approach to a critical examination of a construction problem, the identification of an effective risk management strategy for future construction projects. It further served to emphasize the point that clients are becoming more demanding, more discerning, and less willing to accept risk without recompense. Clients do not want surprise, and are more likely to engage in litigation when things go wrong.
KEY WORDS:Arbitration, claims, construction, contracts, litigation, project and risk
The structural design of the reinforced concrete elements was done by consulting engineers Knight Piesold (KP). Quantity surveying services were provided by Hawkins, Leshnick Bath (HLB). The contract was awarded to Central African Building Corporation (CABCO) who was also responsible for the provision of a specialist roof structure using patented “gang nail” roof trusses. The building construction proceeded to completion and was handed over to th
您可能关注的文档
最近下载
- 2024年河北对外经贸职业学院单招职业适应性测试题库附答案.docx VIP
- 46 黎曼几何初步 [伍鸿熙,沈纯理,虞言林 著] 2014年版.pdf VIP
- 2025-2026学年黑龙江省哈尔滨市德强学校八年级(上)期中化学试卷(五四学制)(含答案).docx
- Axio Vert A1-Xcite使用简述_华兰生物-zgh201903——[蔡司精品].pdf VIP
- 《时速160公里动力集中动车组运用维修管理暂行办法》(2018)200.pdf VIP
- 提高路缘石安装施工一次合格率.docx VIP
- 检验科主任述职报告.pptx VIP
- 2026年河北对外经贸职业学院单招职业适应性测试题库附答案.docx VIP
- 蓝海华腾TS-K系列伺服驱动器使用说明书.pdf
- 《县委书记的榜样——焦裕禄》课文原文阅读 .pdf VIP
原创力文档


文档评论(0)