地下工程沿空巷道隔离煤墙矿压分析-岩土工程专业论文.pdf.docx

地下工程沿空巷道隔离煤墙矿压分析-岩土工程专业论文.pdf.docx

  1. 1、本文档共67页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
地下工程沿空巷道隔离煤墙矿压分析-岩土工程专业论文.pdf

Subject: The research of coal wall’s mine pressure along the goaf in underground engineeringSpecialty: Geotechnical EngineeringName: Li Sheng-yan(Signature) Instructor : Hui Xing-tian(Signature) ABSTRACTGob-side entrydriving can greatly improve the coal’s recovery rate,and save coal resources, it is an important direction of mining construction. Coal pillar’s load、size and thesupport way of roadway is the key factors to determine the success or failure of gob-side entrydriving. Based on the coal pillar’s load theory and the gob-side entrydriving’s strata behaviors when using passive support, This thesis pointed out that gob-side entrydriving should not leave coal pillar from the perspective of reasonable force,.When it need to remain isolated coal pillar, if adopt the passive support,we can only decrease the size of coal pillar as far as possible and the roadway is difficult to maintainThis thesis uses the existing theory to analyse bolt support’s reinforcement mechanism to the narrow coal pillar , points out that the bolt support can improve the coal pillar,’s bearing capacity and lead to the narrow coal pillar effectively share the mine pressure transfered from roadway roof. This is the root cause of the stability of roadway. and puts forward bolt support’s design principle. After a theoretical analyses, expounds the selection method of the coal pillar’s width when using the bolt support, On the premise of bolt support, there is a peak point of abutment pressure both in the coal pillar and entity coal after the roadway is digging,and proved it using MIDAS/GTS numerical simulation software.Based on theory of homeostasis invisible arch,this thesis design the bolting scheme of Zhu jiahe coal mine 14520 gob-side entrydriving ,and optimalizes the coal pillar’s width by numerical simulation software,then combining the calculation formula of coal pillar’ size, determined the reasonable width of narrow coal pillar. By analyzing the monitoring result, the isolated co

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档