南卡罗来纳州可再生能源的可行性分析 59p.pptVIP

南卡罗来纳州可再生能源的可行性分析 59p.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
南卡罗来纳州可再生能源的可行性分析 59p.ppt

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Comments on Landfill Gas to Energy Landfill gas for electric generation is likely the lowest cost renewable energy option in the state. Opportunities to develop projects at almost all of the state’s MSW landfills (53 MW), along with expansions at existing sites (16.6 MW), for a total of almost 70 MW of additional capacity over time. Size of development will depend on level of waste disposal, build-out of gas collection systems, and methane production at each site currently and in the future. Some sites may face competition with direct-use applications of the landfill gas. LandfillGas Hydro Description Hydroelectric generation has been in existence for over a century. It involves the conversion of kinetic hydro energy to electricity by turning a turbine. Mature Technologies Conventional with Impoundments Small Hydro (1 to 30 MWa) Low Power (Conventional) (1 MWa) Emerging Developments Low power (Unconventional) (1 MWa) Microhydro (100 kW) Ocean (Tidal, Wave, Current): Highly site specific for tidal energy, some demonstration projects, but technological issues related to salt water and fish avoidance still need to be resolved. National Installed Capacity: 78,700 MW* SC Installed Capacity: ~3400 MW* Hydro Station * Estimates based on compilation of data from sources including Energy Information Agency, National Renewable Energy Laboratory, Environmental Protection Agency, and other web-based sources. Summary of Hydroelectric Potential ? Assumed Capacity Factor Technical Potential (MW) Practical Potential* (MW) Practical Generation (GWh) Notes 5 MW Conventional 25% 169.1 0.0 0.0 Impoundments at sites listed have not been verified as existing. 1-5 MW Conventional 25% 15.9 3.5 7.7 Only two sites have been verified with existing impoundments. 1-30 MWa New Small Hydro** N/A 153.0 100.0 876.0 Assumes top 15 of 45 sites are practical based on penstock len

文档评论(0)

zhangningclb + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档