造价员继续教育考试 答案(Cost Clerk continuing education examination answer).docVIP

造价员继续教育考试 答案(Cost Clerk continuing education examination answer).doc

  1. 1、本文档共25页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
造价员继续教育考试 答案(Cost Clerk continuing education examination answer).doc

造价员继续教育考试4+答案(Cost Clerk continuing education examination 4+ answer) Examination questions on network continuing education examination for cost employees in 2011 (Tu Jian) Tip: length of examination (50 minutes) remaining time (0 hours, 48 minutes, 10 seconds): please do not close the window and refresh the page during the exam! (the system automatically saves the answer every 10 minutes) Radio question (40), 1 points for each question, 40 points (1) on the block surface layer wall engineering calculation, the following statement is not true (). A: according to the figure size, with the calculation of solid area, B: does not deduct the area within the hole of 0.1m2 C: does not deduct the area of the hole within 0.3m2, and the D: pile and the wall column are merged into the wall calculation (2) according to the calculation of steel window (). A: window and window frame peripheral area B: area C: peripheral area of D: frame window (3) in the ration, the thickness of the binding layer of marble on the ground dry mortar is (). A:1cm B:2cm C:3cm D:4cm (4) plane balcony railing plastering, () calculation. A: distinguish between internal and external walls, incorporate the corresponding wall engineering volume calculation. B: according to internal and external wall wall plastering corresponding quota project, artificial multiplied coefficient 1.2, other unchanged. C: the vertical projection area multiplied by factor 2.2 is calculated in square meters. D: executed by wall piecemeal projects. (5) press plastic window to press () computation. A: frame perimeter area B: aperture area C: D: Tang fan peripheral area (6) the excavation bottom area (Earthworks) A:S M2 B:S, 20m2 = 20 C:S 30 M2 D:S 30 M2 (7) the level of budget quota is () A: average advanced level B: social average C: advanced level of an enterprise D: average level of an enterprise (8) the height of the exterior wall of the brick masonry is equal to A: wall center line, roof panel bottom, B: reinforced concrete

文档评论(0)

zhangningclb + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档