- 1、本文档被系统程序自动判定探测到侵权嫌疑,本站暂时做下架处理。
- 2、如果您确认为侵权,可联系本站左侧在线QQ客服请求删除。我们会保证在24小时内做出处理,应急电话:400-050-0827。
- 3、此文档由网友上传,因疑似侵权的原因,本站不提供该文档下载,只提供部分内容试读。如果您是出版社/作者,看到后可认领文档,您也可以联系本站进行批量认领。
查看更多
Microsoft Word - BGHR-2-SA07-4-2-2013 - ….docx
MECHANICAL SYSTEMBASIC MECHANICAL REQUIREMENTS2PAINTING21ELECTRICAL WORKS FOR MECHANICAL SYSTEM24BASIC MECHANICAL MATERIALS AND METHODS34WELDING38PIPES AND FITTINGS41VALVES65PIPES, FITTINGS AND VALVES - APPLICATION73R/O WATER TREATMENT PLANT81SUPPORTS AND ANCHORS83PUMPS87MECHANICAL IDENTIFICATION90NOISE, VIBRATION SEISMIC CONTROL97EQUIPMENT PIPE INSULATION107FIRE PROTECTION SYSTEM113DUCT INSULATION115DOMESTIC AND SOFT WATER PIPING SYSTEM119SOIL, WASTE ROOF DRAINAGE PIPING SYSTEMS126WATER DISTRIBUTION SYSTEM143PLUMBING FIXTURES145AIR DISTRIBUTION UNITS148DUCTWORK157AIR OUTLETS AND INLETS178TESTING, ADJUSTING AND BALANCING182BASIC MECHANICAL REQUIREMENTPART 1 - GENERAL1.01SUMMARYA.This chapter generally specifies administrative and procedure requirements regarding Mechanical Work. Additional requirements are specified in various chapters of Division 15 and also may be required during the execution work due to project conditions.B.The requirements of this Chapter do not supersede or take precedence over any provision of the General Conditions and Supplementary General Conditions, and should any discrepancy become apparent between these requirements and the General Conditions and Supplementary General Conditions, the Contractor shall notify the Contracting authority in writing, and the Contracting authority shall interpret and decide such matters in accordance with the applicable provisions of the General Conditions and Supplementary General Conditions.PROJECT OUTLINE AND DESCRIPTION A.GeneralThis Book of Specifications covers the General and Particular Specifications for theMechanicalSystemsofthe“Rehabilitation of KFARCHIMA laboratory – Beirut,Lebanon”.B.Project OutlineTheprojectconsistsofanexistingbuilding of 3 floors used for offices, meeting rooms and laboratoriesinadditiontoanewbasement.C.General Description of the WorksThe following Mechanical Systems are included in the Project:a.Water Supply.b.Sanitary Drainage.c.Fire Fighting. d. Air Conditioning. e.Venti
文档评论(0)