- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Technical Memorandum 3b Systemwide Study Alternatives技术备忘录3B系统的研究的方案
Bay Area Regional Rail Plan
Conceptual Alternatives Task
Technical Memorandum 3.b
Systemwide Study Alternatives Refinements
December 13, 2006
OVERVIEW
This technical memorandum summarizes the refinements to Regional Rail Alternatives including BART and railroad-based regional rail services. (High speed rail options and overlay services will be addressed in a separate memorandum.) As such, this memo addresses System Alternatives 1 – 3 (System Alternatives 4 – 12 are those which include High Speed Rail and Regional Overlay Services.)
Since the initial conceptual alternatives were identified, the Regional Rail working group consisting of the Consultant Team acting under the direction of the Project Management Team has been developing information and assembling input from a wide range of sources including:
Meetings and consultations with the two Class I freight railroads – the Burlington Northern Santa Fe (BNSF) and Union Pacific Railroad (UPRR);
Meetings and consultations with Port of Oakland;
Meetings and consultations with the Bay Area Rapid Transit District (BARTD) senior staff;
Meetings and consultations with the Capitol Corridor Joint Powers Authority (CCJPA) senior staff;
Meetings and consultations planners representing Caltrain, the Transbay Transit Center and Dumbarton Rail Project; and,
Meetings and consultations with planners and officials representing various planning zones within the Regional Rail study area including the Tri Valley Area, City of San Francisco, City of San Jose, and other locations.
SYNOPSIS OF SUGGESTED REFINEMENTS
Based upon review and analysis of the data and input received, the working group has identified the following refinements:
Elimination of many of the “freight by-pass” alignments from further consideration, resulting in the elimination of Systemwide Study Alternative 3;
Consolidation and simplification of the three BART alternatives into two distinct study alternatives and design options which carry the most promising plann
您可能关注的文档
- sweethouse营销的的策划的方案.ppt
- syb创业的的策划书女装.doc
- syb创业的的策划书饰品.doc
- syb创业的的策划书鞋店.doc
- SYGCZ17精装修工程质量控制流程2.doc
- Sustainable Development Preserving Environment, Community 可持续发展,保护的环境,社区.ppt
- SWOT系统培训的资料.ppt
- Swatch金属腕表系列新品华南发表会的案例.ppt
- switch power's principle and application开关电源原理及其应用维修技术培训的资料.doc
- System Design Document Template Home Centers for 系统的设计文件模板家庭中心.docx
最近下载
- SICK西克KTS Core色标传感器操作手册.pdf VIP
- GB50345-2012 屋面工程技术规范.docx VIP
- 船舶油漆使用基本基础知识.pdf VIP
- 四年级(上)语文课文同步仿写、续写1.pdf VIP
- 9 天上有颗“南仁东星”课件(共30张PPT)2025-2026学年统编版语文八年级上册.pptx VIP
- 高级保育员课件.pptx VIP
- 第十章生态系统.ppt VIP
- 《脑卒中运动障碍康复护理规范》.pdf VIP
- 2012年全国创新杯说课大赛作品汇总铰链四杆机构的类型及判定说课(新蓝).ppt VIP
- 年处理80吨茯苓提取车间提取工段工艺设计-毕业论文(设计).doc VIP
文档评论(0)