工厂应急计划.docVIP

  • 128
  • 0
  • 约1万字
  • 约 12页
  • 2018-06-29 发布于上海
  • 举报
Revision: 1Emergency Plan 工厂应急计划Date:2015/05/08Page PAGE 1 of NUMPAGES 11Project:GeneralApplication:To all the related Dept. 1. PURPOSE 目的 This procedure guides to prepare contingency plans to satisfy customer requirements in the event of an emergency such as Utility Interruptions, Labour shortages, Key equipment failure and field returns. 本程序的方针是为满足客户需要应制定预案,当发生紧急情况时如资源中断、劳动力短缺、关键设备故障、批量召回。2. RESPONSIBILITIES 职责2.1. The plant manager is responsible to create and maintain this procedure, and coordinate the related departments to carry out the actions. 工厂经理负责制定和维护本程序,并协调各部门予以执行。2.2. In case of absence of the plant manager, this role is taken over by Quality manager 当工厂经理不在时,该职责由质量经理暂代3. PROCEDURE 程序Once the contingency cases occur, the below contingency plans will be follow up. 一旦有影响到产品交付及质量等重大事件/因素发生,以下对应的应急计划将立即启动。分类 Category紧急事件 Emergency Cases负责人Responsible历年发生频率 frequency over the years影响后果 Failure effects演练频次Test frequency预案(一) Contingency Plan 1预案(二) Contingency Plan 2预案(三) Contingency Plan 3预案(四) Contingency Plan 41.公共资源中断 Utility interrupter停电4h以内 Electricity power cut within 4h5次以内 about 5 time per year 影响交付,产品品质 Negative impact on delivery and quality调整生产计划,为交付紧张项目,建立8小时安全库存 Pre-adjust production plan and set up 8 hours stock for the projects with emergency delivery.                 停电4h-48h Electricity power cutbetween 4h-48h5次以内 影响交付,产品品质 Negative impact on delivery and quality租发电机,维持原料罐运转 Rent electric generator to keep the raw material running in the ring line and tanks.准备3天安全库存 prepare 3days safety inventory  停电48h以上 Electricity power cutover 48h2次 影响交付,产品品质 Negative impact on delivery and quality租大功率(1500KW)发电机和线缆 Rent superpower generator and cables to keep production for the emergency delivery. 准备3天安全库存 prepare 3days safety inventory  断网 Internet survice int

文档评论(0)

1亿VIP精品文档

相关文档