新 疆非政府性投资水利项目投融资模式分析-analysis on investment and financing mode of non-governmental investment in water conservancy projects in xinjiang.docx

新 疆非政府性投资水利项目投融资模式分析-analysis on investment and financing mode of non-governmental investment in water conservancy projects in xinjiang.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
新 疆非政府性投资水利项目投融资模式分析-analysis on investment and financing mode of non-governmental investment in water conservancy projects in xinjiang

III III IV IV Study on Modes of Attracting Non Government Investment for Water Conservancy Construction in Xinjiang Abstract On the basis of theoretical research, this paper made a comparative analysis on the practical experience of investment and fund-raising activities of domestic and foreign project of water conservancy, with a systematic research on the issues about the motivation, approaches, conditions, investment compensation and governmental supervision related to the industrial restructuring of national economy and water conservancy construction project on the basis of non-governmental investment on the condition of conversion from agricultural water to industrial water. It also made a research of the case regarding prepaid water rate by enterprise at Sheyuegou Reservoir, Hami Prefecture, so as to offer advice on the policy and regulations of stimulating and guiding the water conservancy project on the basis of non-governmental investment formulated by the government. It covered the analysis on motivation and compensation, economic analysis on the motivation of non-governmental investment,the prerequisite of water conservancy project on the basis of non-governmental investment, the research on the compensation modes and governmental supervision under the existing systems.It made an analysis on the status quo and issues on the exploitation and utilization of water resources and investment and fund-raising of water conservancy in Xinjiang, summarizing main approaches of current water conservancy project on the basis of non-governmental investment.It made an analysis on the case regarding prepaid water rate of the construction of Sheyuegou Reservoir and Xiagou Reservoir invested by the government on the basis of the research results obtained.It made an analysis on the principal-agent behavior between the government and the franchising enterprise by using Holmstrom model and Milgrom model, proposing the water conservancy type suitable for franchising.It drew on

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档