- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
连申线大桥主桥变截面连续箱梁现浇支架和地基处理分析
连申线大桥主桥变截面连续箱梁现浇支架和地基处理分析
Abstract: with the expansion of the area covered bridge, viaduct project more and more, the main bridge variable cross-section of the continuous box construction and foundation treatment, become a bridge engineering often face a problem. To put the whole project premise, must choose the correct solution, and the demonstration of the scheme.
Keywords: continuous box foundation treatment scheme comparison
A project survey,
Even the line of provincial highway 221 bridge is located in HaiAnXian territory, across new Ⅲ level channel even canal (tongyu river), bridge spans layout for 11 × 25 + 11 × 25 m, bridge is a 768.28 m, the main (60 + 90 + 60) m span prestressed concrete cross-section of three continuous box, cross and edge in across the beam height of 2.3 m, 5.2 m high beams fulcrum place, the bottom of the box girder wide and 7.0 m, 14.0 m DingKuan, for single box single room structure. The main construction scheme for the cantilever construction method amplified stents, namely when construction cast-in-situ amplified, LaJia cantilever structure is after. The scheme has a section cast-in-site length is hanging basket poured long suspension characteristics, there are six main suspension for water, 1 fold section, shorten the construction period. Which blocks 0 # 12.4 m long box girder, the stents cast-in-situ piece of a, 1 ~ 6 piece of longitudinal section length for water which is 6.3 m, cast-in-site segments at the side spans length of 13.92 m, side cross section is the closed 2.0 m.
Second, foundation treatment scheme is selected
(1) the main variable cross-section continuous box for the shallow ground water stents (20 m) of geological conditions introduction:
1 layer: grain filling, silty clay is given priority to, contain a few plant roots, the bottom buried deep 0.2 ~ 1.9 m,.
2-1 layer: silty clay clip powder soil, belongs to the compressibility of foundation soil, and the buried d
文档评论(0)