大型立式水泵机组大修后安装垂直同心剖析调整

大型立式水泵机组大修后安装垂直同心剖析调整   摘要:通过多年来对水泵机组维修经验,对大型立式水泵机组大修后安装过程中机组垂直同心进行了分析,并提出相应的调整方法,从而为提高大型立式水泵机组在大修后的安装质量,延长机组使用寿命,减少大修次数提供实践经验。   关键词:大型立式水泵机组;大修;安装;垂直同心;分析调整   Large Vertical Pump overhaul analysis adjusted after installation of the vertical concentric   Abstract:Through many years of experience in maintenance of water pump sets, water pump overhaul of large vertical during the installation process after the crew carried out an analysis of the vertical concentric and make the corresponding adjustment methods, so as to improve the large-scale vertical water pump installed in the overhaul