加速器物理的历史与演进-nsrrc-国家同步辐射研究中心
加速器物理的歷史與演進
(Introduction to Accelerators History and Evolution)
presenter: 陳家祥
2018.01.29
Milestones of NSRRC Development
1983 July Approval of the NSRRC project (TPS)
(TLS) 2006 June TPS proposal submitted to NSC
Ground breaking of civil
1986 Aug. construction in Hsinchu 2007 Dec. TPS project budget approved
by Legislative Yuan
1993 Apr. First beam stored
Ground breaking of TPS civil
2010 Feb.
1993 Oct. SRRC dedication ceremony construction
Three photon beamlines open 2014 Dec. First beam stored (SR lasing)
1994 Apr.
to users
The phase‐I insertion devices
2015 Apr.
1995 Jan. W200 wiggler installed installation
1995 Oct. U100 undulator installed The first light lasing to the
2015 Nov.
Ring energy raised from 1.3 experimental station (port 5A)
1996 Sep.
GeV to 1.5 GeV Phase I IDs commissioning
2016~ now
Phase II IDs installation
1997 Mar. U50 undulator installed
SRRC Spring‐8 signed
1998 Dec.
cooperation agreement
您可能关注的文档
最近下载
- 管理学第六版王凤彬课后习题答案.docx VIP
- 2026 OpenClaw“养龙虾”必备入门课件.pptx
- JB∕T 14579-2023 滚动轴承 球面滚子.pdf
- 2026年江苏城乡建设职业学院单招职业技能测试模拟测试卷附答案.docx VIP
- 2025年互联网营销师用户激活与品牌故事传播专题试卷及解析.pdf VIP
- 2024年黑龙江旅游职业技术学院单招职业适应性测试模拟试题及答案解析.docx VIP
- GB 46031-2025《可燃粉尘工艺系统防爆技术规范》深度解读.pptx VIP
- 中国国家博物馆-研学手册.pdf
- GB50303-2015 建筑电气工程施工质量验收规范.docx VIP
- 啤酒瓶盖自动分拣机设计.docx VIP
原创力文档

文档评论(0)