- 1、本文档共41页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
福电公司台式电脑备件服务项目风险管控-工商管理专业论文
华
华 中 科 技 大 学 硕 士 学 位 论 文
II
II
Abstract
With the development of laptop, net book and smart phone, from 2003 till now, the increase of the desktop sales revenue became flat. The companies’ competence has changed from OEM (Original Equipment Manufacturer) to RD, marketing and post-sales service. In order to meet customers swift changing demand in desktop parts supply of post sales service, companies have to summarize the post-sales experience, optimize the SCM (Supply Chain Management) solutions, shorten the turn around time, increase the flexibility and minimize the project risks.
This thesis explores the project risk management of company Fudian for desktop post-sales parts fulfillment. Firstly, it starts with reviewing the content and characteristics of desktop spare parts fulfillment project in company Fudian. Then it summarizes the risk factor in the following project management period; project initiating, project planning, project executing, project controlling and project ending, so as to set up the risk measurement structure. Thirdly, it designs the project risk multi-hierarchical investigation questionnaires by using multi-criteria evaluation methods, releases the questionnaires to company Fudian’s project manager team, who has at least 5 years service experiences , then, by analysis the investigation result, comes out the critical ones. After that, it finds out the rout cause by using fishbone diagram graphic skill. Finally, the thesis puts forward the appropriate risk response and monitor plan, so as to help the management team to do project risk control. At the meantime, it is expected to be used as a reference or hint for future project managers controlling the related projects in post-sales service.
Key words:Project risk; Desktop spare parts; Post-sales service; Risk control
独创性声明
本人声明所呈交的学位论文是我在导师指导下进行的研究工作及取得的研究成 果。文中除已经标明引用的内容外,不包含任何其他个人或集体已经发表或撰写过 的研究成果。对本文的研究做出贡献的个人和集体,均已在文中以明确方式标明。 本声明的法律责任由本人承担。
学位论文作者签名: 日期: 年 月 日
学位论文版权使用授权书
本学位论文作者完全了解学校有关保留
您可能关注的文档
- 电动轮自卸车牵引机直接转矩控制研究-控制科学与工程专业论文.docx
- 电化学-生物法结合的污泥稳定化新型技术的研究-环境工程专业论文.docx
- 电动除尘清洁车与公共空间的共融性设计-艺术设计专业论文.docx
- 电化学DNA传感器用于急性白血病相关物质的检测-分析化学专业论文.docx
- 电化学传感器应用于环境雌激素-壬基酚检测的研究-公共卫生专业论文.docx
- 电化学传感器用于乙型肝炎病毒快速分型的实验研究-药物分析学专业论文.docx
- 电化学体系中羟基自由基的检测及生成规律的影响研究-冶金物理化学专业论文.docx
- 电化学储能用硅及活性炭材料的研究-化学工程与技术专业论文.docx
- 电化学分析法用于稀土掺杂SnO2电极降解苯酚电极过程研究-环境科学与工程专业论文.docx
- 电化学分析软件的设计与实现-控制工程专业论文.docx
文档评论(0)