- 1、本文档共59页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
地下街顺作法与逆作法施工对比分析建筑与土木工程专业论文
哈尔滨工业大学工程硕士学位论文
哈尔滨工业大学工程硕士学位论文
-
- II -
Abstract
With economic development and social progress, the conflict between population and land becomes more and more prominent. For human sustainable development, the harmony between human and nature is a critical issue.
Only as far as the urbanization is concerned, people cannot allow urban unbridled expansion. Therefore, it would be a very necessary process of the urban development shifting from two-dimensional to three-dimensional. Then in the city there are more underground structures. In those underground structures, the construction of Underground Street is firstly considered. For the people’s interests, the problems of the underground street’s construction which would be encountered in process or have encountered need to be gradually resolved in the current stage.
There isn’t uniform construction method because of the different locations and different soil conditions and so on. However, the choice of construction methods has inestimable impact on a project; therefore the choice of construction method is a problem which is worth researching.
The construction methods of Underground Street mainly include the up-down method and down-up approach. In this paper, through MIDAS software the construction process of Underground Street which is constructed with up-down method and down-up approach is simulated. And their effects are analyzed in order to provide a reference for the selection of construction methods to the similar projects.
The main contents of this article are as follows:
Use MIDAS software to simulate the construction process of the Underground Street which is built with up-down method and down-up approach respectively. Based on the actual construction phases, the actual project is excavated with simulated method according to the actual construction phrases ;
Through the results processing and analysis, the change of the ground settlement, lateral horizontal displacement of foundation pit and the uplift of the u
您可能关注的文档
- 刚性路面结构的有限元-无限元耦合静动力特性研究-工程力学专业论文.docx
- 刚性面下孔洞、夹杂和裂纹动力反平面相互作用-固体力学专业论文.docx
- 刚构 连续组合梁桥地震响应分析-桥梁与隧道工程专业论文.docx
- 刚性长短桩复合地基长短桩相互作用 机制的试验研究-建筑与土木工程专业论文.docx
- 刚构-连续组合梁桥地震响应分析-桥梁与隧道工程专业论文.docx
- 刚柔祸合齿轮箱系统的故障特征分析与研究-机械电子工程专业论文.docx
- 刚柔嵌段共轭聚合物的设计、合成及自组装的研究-光学专业论文.docx
- 到达时间与工期同序的串行批处理机排序问题-应用数学专业论文.docx
- 刚柔耦合掘进机虚拟样机仿真分析-机械制造及其自动化专业论文.docx
- 副产SiCl4制备正硅酸乙酯新工艺的研究-化学工程专业论文.docx
最近下载
- 2024年初三语文期末考试考点总结.pdf VIP
- 辽宁省盘锦市盘山县2022-2023学年八年级上学期期末考试地理生物试题_1504.docx VIP
- 销售人员培训课件课程(完整体系).pptx
- 银行安全员年度工作总结8篇.docx
- 贵州省地图含市县地图矢量分层地图行政区划市县概况ppt模板.pptx
- 《HSE培训教程》课件.ppt VIP
- 江苏省南京市鼓楼区金陵汇文学校2024-2025学年七年级上学期12月月考英语试题(含答案,无听力原文及音频).pdf VIP
- 论文-《简·爱》与女性尊严.doc
- 云南农业大学《现代企业管理》2022-2023学年第一学期期末试卷.doc VIP
- 完整全国三甲医院名录.doc
文档评论(0)